IAC logo
IAC Assessment: MO0043
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1991
Principal Product FIRE BRICK
NAICS n/a
SIC 3255 - Clay Refractories
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 0
Annual Production 7,700,000 Pieces
Production Hrs. Annual 6,864
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $398,558 6,282,532 kWh $0.06
Natural Gas $407,446 166,560 MMBtu $2.45
TOTAL ENERGY COSTS $806,004
RECOMMENDED SAVINGS* $50,203 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$28,978
Cost:
-
$216 3,517 $28,762 - $216
3,517
kWh
$28,762
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,765
Cost:
-
$7,765 122,509 - - $7,765
122,509
kWh
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,143
Cost:
$2,738
$1,143 17,878 - - $1,143
17,878
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,499
Cost:
-
$1,581 24,912 $(-82) - $1,581
24,912
kWh
$(-82)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$376
Cost:
$300
$376 5,862 - - $376
5,862
kWh
-
-
$
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$2,924
Cost:
-
$2,924 46,014 - - $2,924
46,014
kWh
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,518
Cost:
$416
$7,518 118,406 - - $7,518
118,406
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$50,203
Cost:
$3,454
$21,523 339,098 $28,680 - $21,523
339,098
kWh
$28,680
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$