IAC logo
IAC Assessment: MO0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1992
Principal Product TRUCK AXLES
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 195,000 Pieces
Production Hrs. Annual 6,600
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,731 2,719,519 kWh $0.06
Natural Gas $17,688 3,054 MMBtu $5.79
TOTAL ENERGY COSTS $185,419
RECOMMENDED SAVINGS* $8,645 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,540
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$1,554
Cost:
$300
- - $1,554 - - - -
-
kWh
$1,554
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,522
Cost:
$700
$1,522 24,619 - - - - $1,522
24,619
kWh
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,618
Cost:
$20
$1,618 26,377 - - - - $1,618
26,377
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,712
Cost:
$1,400
$1,712 27,843 - - - - $1,712
27,843
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$616
Cost:
$491
$714 11,723 - - $(-98) - $714
11,723
kWh
-
-
MMBtu
$(-98)
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$69
Cost:
$255
$69 1,172 - - - - $69
1,172
kWh
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$372
Cost:
-
$372 6,155 - - - - $372
6,155
kWh
-
-
MMBtu
-
-
$
08: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$828
Cost:
$240
$828 13,482 - - - - $828
13,482
kWh
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$354
Cost:
$551
$354 5,862 - - - - $354
5,862
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,645
Cost:
$3,957
$7,189 117,233 $1,554 - $(-98) - $7,189
117,233
kWh
$1,554
-
MMBtu
$(-98)
-
$
TOTAL IMPLEMENTED Savings:
$2,540
Cost:
$1,640
$2,540 41,325 - - - - $2,540
41,325
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes