IAC logo
IAC Assessment: MO0063
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0063
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1992
Principal Product BRAKE LEVER ASSEMBLIES
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 228
Plant Area (Sq.Ft.) 0
Annual Production 208,000 Pieces
Production Hrs. Annual 6,630
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,922 4,505,276 kWh $0.06
Natural Gas $71,648 16,626 MMBtu $4.31
TOTAL ENERGY COSTS $338,570
RECOMMENDED SAVINGS* $57,949 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,216
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$28,257
Cost:
-
$34,055 315,358 $(-5,798) (-1,345) - - $34,055
315,358
kWh
$(-5,798)
(-1,345)
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,485
Cost:
-
$15,963 134,818 $(-2,478) (-575) - - $15,963
134,818
kWh
$(-2,478)
(-575)
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,732
Cost:
$1,000
$4,732 80,012 - - - - $4,732
80,012
kWh
-
-
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,778
Cost:
$150
$3,778 63,892 - - - - $3,778
63,892
kWh
-
-
MMBtu
-
-
$
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,757
Cost:
-
$2,757 46,600 - - - - $2,757
46,600
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$897
Cost:
$850
$1,201 20,223 - - $(-304) - $1,201
20,223
kWh
-
-
MMBtu
$(-304)
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,845
Cost:
$14,900
$2,845 48,066 - - - - $2,845
48,066
kWh
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$964
Cost:
$12,900
$964 16,413 - - - - $964
16,413
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$133
Cost:
-
$133 2,345 - - - - $133
2,345
kWh
-
-
MMBtu
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$101
Cost:
$253
$101 1,758 - - - - $101
1,758
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$57,949
Cost:
$30,053
$66,529 729,485 $(-8,276) (-1,920) $(-304) - $66,529
729,485
kWh
$(-8,276)
(-1,920)
MMBtu
$(-304)
-
$
TOTAL IMPLEMENTED Savings:
$13,216
Cost:
$29,800
$13,520 228,606 - - $(-304) - $13,520
228,606
kWh
-
-
MMBtu
$(-304)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes