IAC logo
IAC Assessment: MO0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1992
Principal Product TEMPERATURE CONTROLS
NAICS n/a
SIC 3822 - Environmental Controls
Sales $10,000,000-$50,000,000
# of Employees 368
Plant Area (Sq.Ft.) 0
Annual Production 75,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $687,246 10,415,885 kWh $0.07
Natural Gas $132,285 27,700 MMBtu $4.78
TOTAL ENERGY COSTS $819,531
RECOMMENDED SAVINGS* $99,974 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,600
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,227
Cost:
$30,000
$8,227 124,853 - - - - $8,227
124,853
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,783
Cost:
$2,300
$12,777 193,728 - - $(-994) - $12,777
193,728
kWh
-
-
MMBtu
$(-994)
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,873
Cost:
$29,500
$1,873 28,429 - - - - $1,873
28,429
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,081
Cost:
-
$5,081 77,081 - - - - $5,081
77,081
kWh
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,539
Cost:
$100
$7,539 114,302 - - - - $7,539
114,302
kWh
-
-
MMBtu
-
-
$
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$62,835
Cost:
$300
- - $62,835 - - - -
-
kWh
$62,835
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,636
Cost:
$1,195
- - $2,636 551 - - -
-
kWh
$2,636
551
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$99,974
Cost:
$63,395
$35,497 538,393 $65,471 551 $(-994) - $35,497
538,393
kWh
$65,471
551
MMBtu
$(-994)
-
$
TOTAL IMPLEMENTED Savings:
$29,600
Cost:
$62,995
$27,958 424,091 $2,636 551 $(-994) - $27,958
424,091
kWh
$2,636
551
MMBtu
$(-994)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes