IAC logo
IAC Assessment: MO0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1992
Principal Product ELECTRICAL HEATERS
NAICS n/a
SIC 3567 - Industrial Furnaces And Ovens
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 0
Annual Production 729,000 Pieces
Production Hrs. Annual 4,438
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $449,638 6,772,274 kWh $0.07
TOTAL ENERGY COSTS $449,638
RECOMMENDED SAVINGS* $8,043 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,858
Cost:
$45,000
$4,858 73,271 - - $4,858
73,271
kWh
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$470
Cost:
$5,000
$470 7,034 - - $470
7,034
kWh
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$214
Cost:
$195
$214 3,224 - - $214
3,224
kWh
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,635
Cost:
$830
$1,635 24,619 - - $1,635
24,619
kWh
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$866
Cost:
-
$52 879 $814 - $52
879
kWh
$814
-
$
TOTAL RECOMMENDED Savings:
$8,043
Cost:
$51,025
$7,229 109,027 $814 - $7,229
109,027
kWh
$814
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes