IAC logo
IAC Assessment: MO0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1992
Principal Product ELECTRIC MOTORS
NAICS n/a
SIC 3621 - Motors And Generators
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 40,000 Pieces
Production Hrs. Annual 4,420
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,572 854,338 kWh $0.07
LPG $10,529 1,458 MMBtu $7.22
TOTAL ENERGY COSTS $70,101
RECOMMENDED SAVINGS* $5,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $643
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$328
Cost:
$6,500
$328 4,689 - - $328
4,689
kWh
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$948
Cost:
$370
$948 13,482 - - $948
13,482
kWh
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$643
Cost:
$150
$643 9,379 - - $643
9,379
kWh
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$312
Cost:
$670
$312 4,396 - - $312
4,396
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$677
Cost:
$5,000
$677 9,672 - - $677
9,672
kWh
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$764
Cost:
$332
$868 12,603 $(-104) - $868
12,603
kWh
$(-104)
-
$
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,493
Cost:
-
$54 879 $1,439 - $54
879
kWh
$1,439
-
$
TOTAL RECOMMENDED Savings:
$5,165
Cost:
$13,022
$3,830 55,100 $1,335 - $3,830
55,100
kWh
$1,335
-
$
TOTAL IMPLEMENTED Savings:
$643
Cost:
$150
$643 9,379 - - $643
9,379
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes