IAC logo
IAC Assessment: MO0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1993
Principal Product Licorice Candies and Starch-Jellies
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $50,000,000-$100,000,000
# of Employees 285
Plant Area (Sq.Ft.) 175,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $739,498 11,670,575 kWh $0.06
Natural Gas $235,119 72,845 MMBtu $3.23
TOTAL ENERGY COSTS $974,617
RECOMMENDED SAVINGS* $152,014 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $119,891
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,594
Cost:
$17,057
$8,594 135,698 - - - - $8,594
135,698
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$247
Cost:
$570
$247 3,810 - - - - $247
3,810
kWh
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,239
Cost:
$963
$4,239 66,823 - - - - $4,239
66,823
kWh
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,688
Cost:
$100
$3,688 58,324 - - - - $3,688
58,324
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,881
Cost:
$30,661
$16,881 266,413 - - - - $16,881
266,413
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,518
Cost:
$1,258
$7,518 118,699 - - - - $7,518
118,699
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,227
Cost:
$995
- - $10,227 3,166 - - -
-
kWh
$10,227
3,166
MMBtu
-
-
$
08: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$86,898
Cost:
$300
- - - - $86,898 - -
-
kWh
-
-
MMBtu
$86,898
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,722
Cost:
$996
$13,722 217,468 - - - - $13,722
217,468
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$152,014
Cost:
$52,900
$54,889 867,235 $10,227 3,166 $86,898 - $54,889
867,235
kWh
$10,227
3,166
MMBtu
$86,898
-
$
TOTAL IMPLEMENTED Savings:
$119,891
Cost:
$49,276
$32,993 520,810 - - $86,898 - $32,993
520,810
kWh
-
-
MMBtu
$86,898
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes