IAC logo
IAC Assessment: MO0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1993
Principal Product Magnet Wire
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 146,000
Annual Production 19,200,000 Pieces
Production Hrs. Annual 8,400
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $732,234 18,475,674 kWh $0.04
Natural Gas $366,743 53,521 MMBtu $6.85
TOTAL ENERGY COSTS $1,098,977
RECOMMENDED SAVINGS* $139,048 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,306
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,616
Cost:
$995
- - $1,616 236 - - -
-
kWh
$1,616
236
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,144
Cost:
$1,056
$3,144 79,426 - - - - $3,144
79,426
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,607
Cost:
$840
$3,607 91,149 - - - - $3,607
91,149
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,396
Cost:
$24,210
$8,396 211,899 - - - - $8,396
211,899
kWh
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,690
Cost:
$30,575
$13,690 345,252 - - - - $13,690
345,252
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,617
Cost:
$575
$1,617 40,739 - - - - $1,617
40,739
kWh
-
-
MMBtu
-
-
$
07: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$106,184
Cost:
$8,000
- - - - $106,184 - -
-
kWh
-
-
MMBtu
$106,184
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$794
Cost:
$525
$558 14,068 $236 34 - - $558
14,068
kWh
$236
34
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$139,048
Cost:
$66,776
$31,012 782,533 $1,852 270 $106,184 - $31,012
782,533
kWh
$1,852
270
MMBtu
$106,184
-
$
TOTAL IMPLEMENTED Savings:
$15,306
Cost:
$31,570
$13,690 345,252 $1,616 236 - - $13,690
345,252
kWh
$1,616
236
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes