IAC logo
IAC Assessment: MO0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1993
Principal Product FRAC. HP MOTORS
NAICS n/a
SIC 3621 - Motors And Generators
Sales $50,000,000-$100,000,000
# of Employees 650
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $481,026 9,118,699 kWh $0.05
LPG $11,991 2,249 MMBtu $5.33
Fuel Oil #1 $18,422 3,292 MMBtu $5.60
TOTAL ENERGY COSTS $511,439
RECOMMENDED SAVINGS* $38,445 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,075
#|Description Savings
Cost
Status Electricity Usage Natural Gas LPG Administrative Changes Electricity Usage Natural Gas LPG Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,408
Cost:
$1,243
- - - - $1,408 264 - - -
-
kWh
-
-
MMBtu
$1,408
264
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,000
Cost:
$13,675
$4,000 75,909 - - - - - - $4,000
75,909
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$75
Cost:
$20
$81 1,465 - - - - $(-6) - $81
1,465
kWh
-
-
MMBtu
-
-
MMBtu
$(-6)
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,376
Cost:
$9,298
$3,376 63,892 - - - - - - $3,376
63,892
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$378
Cost:
$490
$378 7,034 - - - - - - $378
7,034
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$29,208
Cost:
$43,264
$44,576 844,959 $(-15,368) (-2,883) - - - - $44,576
844,959
kWh
$(-15,368)
(-2,883)
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,445
Cost:
$67,990
$52,411 993,259 $(-15,368) (-2,883) $1,408 264 $(-6) - $52,411
993,259
kWh
$(-15,368)
(-2,883)
MMBtu
$1,408
264
MMBtu
$(-6)
-
$
TOTAL IMPLEMENTED Savings:
$4,075
Cost:
$13,695
$4,081 77,374 - - - - $(-6) - $4,081
77,374
kWh
-
-
MMBtu
-
-
MMBtu
$(-6)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas LPG Administrative Changes Electricity Usage Natural Gas LPG Administrative Changes