Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1993 |
Principal Product | FRAC. HP MOTORS |
NAICS | n/a |
SIC | 3621 - Motors And Generators |
Sales | $50,000,000-$100,000,000 |
# of Employees | 650 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 2,500,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $481,026 | 9,118,699 | kWh | $0.05 |
LPG | $11,991 | 2,249 | MMBtu | $5.33 |
Fuel Oil #1 | $18,422 | 3,292 | MMBtu | $5.60 |
TOTAL ENERGY COSTS | $511,439 | |||
RECOMMENDED SAVINGS* | $38,445 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,075 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Administrative Changes | Electricity Usage | Natural Gas | LPG | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,408 Cost: $1,243 |
- | - | - | - | $1,408 | 264 | - | - |
- - kWh |
- - MMBtu |
$1,408 264 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,000 Cost: $13,675 |
$4,000 | 75,909 | - | - | - | - | - | - |
$4,000 75,909 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $75 Cost: $20 |
$81 | 1,465 | - | - | - | - | $(-6) | - |
$81 1,465 kWh |
- - MMBtu |
- - MMBtu |
$(-6) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,376 Cost: $9,298 |
$3,376 | 63,892 | - | - | - | - | - | - |
$3,376 63,892 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $378 Cost: $490 |
$378 | 7,034 | - | - | - | - | - | - |
$378 7,034 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $29,208 Cost: $43,264 |
$44,576 | 844,959 | $(-15,368) | (-2,883) | - | - | - | - |
$44,576 844,959 kWh |
$(-15,368) (-2,883) MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,445 Cost: $67,990 |
$52,411 | 993,259 | $(-15,368) | (-2,883) | $1,408 | 264 | $(-6) | - | $52,411 993,259 kWh |
$(-15,368) (-2,883) MMBtu |
$1,408 264 MMBtu |
$(-6) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,075 Cost: $13,695 |
$4,081 | 77,374 | - | - | - | - | $(-6) | - | $4,081 77,374 kWh |
- - MMBtu |
- - MMBtu |
$(-6) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Administrative Changes | Electricity Usage | Natural Gas | LPG | Administrative Changes |