IAC logo
IAC Assessment: MO0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1993
Principal Product Electric Motors
NAICS n/a
SIC 3621 - Motors And Generators
Sales $50,000,000-$100,000,000
# of Employees 552
Plant Area (Sq.Ft.) 380,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 6,864
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $541,502 13,646,249 kWh $0.04
Natural Gas $74,344 25,447 MMBtu $2.92
TOTAL ENERGY COSTS $615,846
RECOMMENDED SAVINGS* $133,033 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,806
#|Description Savings
Cost
Status Electricity Usage Water Disposal Electricity Usage Water Disposal
$ kWh $ Tgal
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$67,868
Cost:
$8,774
$67,868 1,710,434 - - $67,868
1,710,434
kWh
-
-
Tgal
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$5,635
Cost:
$100
$5,635 142,145 - - $5,635
142,145
kWh
-
-
Tgal
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$204
Cost:
-
$204 5,275 - - $204
5,275
kWh
-
-
Tgal
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$43,359
Cost:
$7,325
- - $43,359 - -
-
kWh
$43,359
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$515
Cost:
$1,024
$515 12,896 - - $515
12,896
kWh
-
-
Tgal
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,317
Cost:
$31,982
$9,317 234,760 - - $9,317
234,760
kWh
-
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,548
Cost:
$1,125
$2,548 64,185 - - $2,548
64,185
kWh
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,346
Cost:
$777
$2,346 59,203 - - $2,346
59,203
kWh
-
-
Tgal
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$907
Cost:
$554
$907 22,860 - - $907
22,860
kWh
-
-
Tgal
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$334
Cost:
$20
$334 8,499 - - $334
8,499
kWh
-
-
Tgal
TOTAL RECOMMENDED Savings:
$133,033
Cost:
$51,681
$89,674 2,260,257 $43,359 - $89,674
2,260,257
kWh
$43,359
-
Tgal
TOTAL IMPLEMENTED Savings:
$21,806
Cost:
$35,582
$21,806 549,823 - - $21,806
549,823
kWh
-
-
Tgal
Savings
Cost
$ kWh $ Tgal
Electricity Usage Water Disposal Electricity Usage Water Disposal