IAC Assessment: MO0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1994
Principal Product Grass Seed, Bird Feed
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 283,600
Annual Production 175,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $288,285 6,175,557 kWh $0.05
LPG $38,490 6,422 MMBtu $5.99
TOTAL ENERGY COSTS $326,775
RECOMMENDED SAVINGS* $28,204 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,443
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$9,743
Cost:
$365
- - - - $9,743 - -
-
kWh
-
-
MMBtu
$9,743
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,835
Cost:
$11,383
$6,835 146,542 - - - - $6,835
146,542
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,487
Cost:
$1,380
$2,487 53,341 - - - - $2,487
53,341
kWh
-
-
MMBtu
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,705
Cost:
$3,453
$7,803 167,057 $(-4,098) (-684) - - $7,803
167,057
kWh
$(-4,098)
(-684)
MMBtu
-
-
$
05: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$8
Cost:
$20
- - $8 1 - - -
-
kWh
$8
1
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,443
Cost:
$911
$1,443 31,067 - - - - $1,443
31,067
kWh
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,433
Cost:
$50
$1,433 30,774 - - - - $1,433
30,774
kWh
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,743
Cost:
$9,239
$1,743 37,222 - - - - $1,743
37,222
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$807
Cost:
$373
$807 17,292 - - - - $807
17,292
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,204
Cost:
$27,174
$22,551 483,295 $(-4,090) (-683) $9,743 - $22,551
483,295
kWh
$(-4,090)
(-683)
MMBtu
$9,743
-
$
TOTAL IMPLEMENTED Savings:
$1,443
Cost:
$911
$1,443 31,067 - - - - $1,443
31,067
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes