IAC logo
IAC Assessment: MO0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1994
Principal Product air compressors
NAICS n/a
SIC 3563 - Air And Gas Compressors
Sales $10,000,000-$50,000,000
# of Employees 102
Plant Area (Sq.Ft.) 140,000
Annual Production 7,700 Pieces
Production Hrs. Annual 5,202
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,920 1,601,114 kWh $0.07
Natural Gas $49,444 10,288 MMBtu $4.81
TOTAL ENERGY COSTS $157,364
RECOMMENDED SAVINGS* $8,432 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,176
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,166
Cost:
$14,610
$3,166 46,893 - - $3,166
46,893
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,363
Cost:
$548
$1,363 20,223 - - $1,363
20,223
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,039
Cost:
$2,844
$1,039 15,533 - - $1,039
15,533
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$416
Cost:
$220
$416 6,155 - - $416
6,155
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,192
Cost:
$45
$2,192 32,532 - - $2,192
32,532
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$256
Cost:
$274
$385 5,862 $(-129) (-25) $385
5,862
kWh
$(-129)
(-25)
MMBtu
TOTAL RECOMMENDED Savings:
$8,432
Cost:
$18,541
$8,561 127,198 $(-129) (-25) $8,561
127,198
kWh
$(-129)
(-25)
MMBtu
TOTAL IMPLEMENTED Savings:
$8,176
Cost:
$18,267
$8,176 121,336 - - $8,176
121,336
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu