IAC logo
IAC Assessment: MO0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1995
Principal Product oil and water based paint
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $50,000,000-$100,000,000
# of Employees 82
Plant Area (Sq.Ft.) 157,725
Annual Production 66,039 Thousand Gallons
Production Hrs. Annual 4,680
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $236,198 3,852,286 kWh $0.06
LPG $3,252 360 MMBtu $9.03
TOTAL ENERGY COSTS $239,450
RECOMMENDED SAVINGS* $27,342 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,810
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,744
Cost:
$29,900
$9,744 182,298 - - $9,744
182,298
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,009
Cost:
$306
$1,009 20,516 - - $1,009
20,516
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,808
Cost:
$13,744
$4,808 88,218 - - $4,808
88,218
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,401
Cost:
$725
$2,401 20,516 - - $2,401
20,516
kWh
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,228
Cost:
$100
$5,228 97,597 - - $5,228
97,597
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,848
Cost:
$353
$1,848 34,584 - - $1,848
34,584
kWh
-
-
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,213
Cost:
$4,880
$4,925 92,907 $(-2,712) (-396) $4,925
92,907
kWh
$(-2,712)
(-396)
MMBtu
08: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$91
Cost:
$40
$91 1,465 - - $91
1,465
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,342
Cost:
$50,048
$30,054 538,101 $(-2,712) (-396) $30,054
538,101
kWh
$(-2,712)
(-396)
MMBtu
TOTAL IMPLEMENTED Savings:
$19,810
Cost:
$45,028
$19,810 346,132 - - $19,810
346,132
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG