IAC logo
IAC Assessment: MO0150
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0150
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1995
Principal Product Coatings and Paints
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 1,000,000 Thousand Gallons
Production Hrs. Annual 2,200
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,490 1,053,048 kWh $0.08
Natural Gas $22,827 4,608 MMBtu $4.95
TOTAL ENERGY COSTS $110,940
RECOMMENDED SAVINGS* $34,343 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,243
#|Description Savings
Cost
Status Electricity Usage Water Disposal Other Liquid (non-haz) Electricity Usage Water Disposal Other Liquid (non-haz)
$ kWh $ Tgal $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,896
Cost:
$8,456
$4,896 65,358 - - - - $4,896
65,358
kWh
-
-
Tgal
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,749
Cost:
$2,589
$2,749 36,635 - - - - $2,749
36,635
kWh
-
-
Tgal
-
-
gal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$463
Cost:
$395
$463 5,862 - - - - $463
5,862
kWh
-
-
Tgal
-
-
gal
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$609
Cost:
$195
$609 7,034 - - - - $609
7,034
kWh
-
-
Tgal
-
-
gal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$406
Cost:
$586
$406 5,569 - - - - $406
5,569
kWh
-
-
Tgal
-
-
gal
06: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$120
Cost:
$40
$120 2,345 - - - - $120
2,345
kWh
-
-
Tgal
-
-
gal
07: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$1,100
Cost:
$2,500
$100 1,465 $1,000 346,920 - - $100
1,465
kWh
$1,000
346,920
Tgal
-
-
gal
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$24,000
Cost:
$20,000
- - - - $24,000 - -
-
kWh
-
-
Tgal
$24,000
-
gal
TOTAL RECOMMENDED Savings:
$34,343
Cost:
$34,761
$9,343 124,268 $1,000 346,920 $24,000 - $9,343
124,268
kWh
$1,000
346,920
Tgal
$24,000
-
gal
TOTAL IMPLEMENTED Savings:
$9,243
Cost:
$12,261
$9,243 122,803 - - - - $9,243
122,803
kWh
-
-
Tgal
-
-
gal
Savings
Cost
$ kWh $ Tgal $ gal
Electricity Usage Water Disposal Other Liquid (non-haz) Electricity Usage Water Disposal Other Liquid (non-haz)