IAC logo
IAC Assessment: MO0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1995
Principal Product Milk Products
NAICS n/a
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 217
Plant Area (Sq.Ft.) 140,000
Annual Production 100,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $785,985 13,257,913 kWh $0.06
Fuel Oil #6 $534,197 213,453 MMBtu $2.50
TOTAL ENERGY COSTS $1,459,117
RECOMMENDED SAVINGS* $46,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,312
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Water Disposal Electricity Usage Fuel Oil #6 Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,462
Cost:
$33,805
$14,462 239,449 - - - - $14,462
239,449
kWh
-
-
MMBtu
-
-
Tgal
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,290
Cost:
-
$1,290 19,930 - - - - $1,290
19,930
kWh
-
-
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,179
Cost:
$7,217
$14,179 254,689 - - - - $14,179
254,689
kWh
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,061
Cost:
$2,352
$6,061 108,734 - - - - $6,061
108,734
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$185
Cost:
$245
$185 3,224 - - - - $185
3,224
kWh
-
-
MMBtu
-
-
Tgal
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,643
Cost:
$1,195
- - $3,643 1,457 - - -
-
kWh
$3,643
1,457
MMBtu
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,671
Cost:
$1,259
$1,671 29,894 - - - - $1,671
29,894
kWh
-
-
MMBtu
-
-
Tgal
08: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$5,049
Cost:
$700
- - - - $5,049 6,311 -
-
kWh
-
-
MMBtu
$5,049
6,311
Tgal
TOTAL RECOMMENDED Savings:
$46,540
Cost:
$46,773
$37,848 655,920 $3,643 1,457 $5,049 6,311 $37,848
655,920
kWh
$3,643
1,457
MMBtu
$5,049
6,311
Tgal
TOTAL IMPLEMENTED Savings:
$27,312
Cost:
$38,856
$23,669 401,231 $3,643 1,457 - - $23,669
401,231
kWh
$3,643
1,457
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Fuel Oil #6 Water Disposal Electricity Usage Fuel Oil #6 Water Disposal