IAC Assessment: MO0168
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0168
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product High Quality Printed Material
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 64,000
Annual Production 6,100,000 Pounds
Production Hrs. Annual 5,304
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,544 2,470,106 kWh $0.05
Electricity Demand $16,132 7,377 kW-months/year $2.19
TOTAL ENERGY COSTS $154,136
RECOMMENDED SAVINGS* $23,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,529
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)
$ kWh $ kW-months/year $ gal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,417
Cost:
$6,227
$3,196 53,927 $221 112 - - $3,196
53,927
kWh
$221
112
kW-months/year
-
-
gal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$482
Cost:
$43
$446 7,620 $36 18 - - $446
7,620
kWh
$36
18
kW-months/year
-
-
gal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,560
Cost:
$109
$1,446 24,326 $114 58 - - $1,446
24,326
kWh
$114
58
kW-months/year
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,649
Cost:
$10,288
$8,972 151,524 $677 342 - - $8,972
151,524
kWh
$677
342
kW-months/year
-
-
gal
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,443
Cost:
$3,700
$1,443 24,326 - - - - $1,443
24,326
kWh
-
-
kW-months/year
-
-
gal
06: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$6,460
Cost:
-
- - - - $6,460 2,090 -
-
kWh
-
-
kW-months/year
$6,460
2,090
gal
TOTAL RECOMMENDED Savings:
$23,011
Cost:
$20,367
$15,503 261,723 $1,048 530 $6,460 2,090 $15,503
261,723
kWh
$1,048
530
kW-months/year
$6,460
2,090
gal
TOTAL IMPLEMENTED Savings:
$22,529
Cost:
$20,324
$15,057 254,103 $1,012 512 $6,460 2,090 $15,057
254,103
kWh
$1,012
512
kW-months/year
$6,460
2,090
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)