IAC Assessment: MO0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Clay/Alumina Brick/specialties
NAICS n/a
SIC 3255 - Clay Refractories
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 700,000
Annual Production 115,000 Tons
Production Hrs. Annual 4,080
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $582,583 12,303,634 kWh $0.05
Electricity Demand $60,223 34,358 kW-months/year $1.75
Natural Gas $1,010,821 520,359 MMBtu $1.94
TOTAL ENERGY COSTS $1,683,148
RECOMMENDED SAVINGS* $137,258 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,567
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$65,314
Cost:
$178,547
$59,685 1,188,453 $5,629 3,494 - - - - $59,685
1,188,453
kWh
$5,629
3,494
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.2313 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED Savings:
$27,170
Cost:
$59,040
- - - - $27,170 14,006 - - -
-
kWh
-
-
kW-months/year
$27,170
14,006
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,379
Cost:
$19,088
$5,795 115,475 $584 362 - - - - $5,795
115,475
kWh
$584
362
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,127
Cost:
$5,193
$4,671 92,907 $456 283 - - - - $4,671
92,907
kWh
$456
283
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,747
Cost:
$1,208
$3,424 68,288 $323 200 - - - - $3,424
68,288
kWh
$323
200
kW-months/year
-
-
MMBtu
-
-
lb
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$29,521
Cost:
$90,000
- - - - - - $29,521 5,012,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$29,521
5,012,000
lb
TOTAL RECOMMENDED Savings:
$137,258
Cost:
$353,076
$73,575 1,465,123 $6,992 4,339 $27,170 14,006 $29,521 5,012,000 $73,575
1,465,123
kWh
$6,992
4,339
kW-months/year
$27,170
14,006
MMBtu
$29,521
5,012,000
lb
TOTAL IMPLEMENTED Savings:
$80,567
Cost:
$204,036
$73,575 1,465,123 $6,992 4,339 - - - - $73,575
1,465,123
kWh
$6,992
4,339
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)