IAC logo
IAC Assessment: MO0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Steel Trusses
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 50,000
Annual Production 30,000 Tons
Production Hrs. Annual 6,360
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,207 3,404,748 kWh $0.03
Electricity Demand $11,497 7,205 kW-months/year $1.60
TOTAL ENERGY COSTS $142,754
RECOMMENDED SAVINGS* $15,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,411
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)
$ kWh $ kW-months/year $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$532
Cost:
$1,107
$464 12,016 $68 46 - - $464
12,016
kWh
$68
46
kW-months/year
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$999
Cost:
$2,944
$859 21,981 $140 94 - - $859
21,981
kWh
$140
94
kW-months/year
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$151
Cost:
-
$144 3,810 $7 5 - - $144
3,810
kWh
$7
5
kW-months/year
-
-
gal
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$219
Cost:
-
$205 5,275 $14 10 - - $205
5,275
kWh
$14
10
kW-months/year
-
-
gal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,607
Cost:
$4,540
$1,467 37,808 $140 94 - - $1,467
37,808
kWh
$140
94
kW-months/year
-
-
gal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$789
Cost:
$50
$733 18,757 $56 37 - - $733
18,757
kWh
$56
37
kW-months/year
-
-
gal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$907
Cost:
$206
$844 21,688 $63 42 - - $844
21,688
kWh
$63
42
kW-months/year
-
-
gal
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$573
Cost:
$88
$533 13,775 $40 26 - - $533
13,775
kWh
$40
26
kW-months/year
-
-
gal
09: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$9,634
Cost:
$7,700
- - - - $9,634 1,892 -
-
kWh
-
-
kW-months/year
$9,634
1,892
gal
TOTAL RECOMMENDED Savings:
$15,411
Cost:
$16,635
$5,249 135,110 $528 354 $9,634 1,892 $5,249
135,110
kWh
$528
354
kW-months/year
$9,634
1,892
gal
TOTAL IMPLEMENTED Savings:
$15,411
Cost:
$16,635
$5,249 135,110 $528 354 $9,634 1,892 $5,249
135,110
kWh
$528
354
kW-months/year
$9,634
1,892
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)