Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1996 |
Principal Product | Industrial Electric Heaters |
NAICS | n/a |
SIC | 3527 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 170,000 |
Annual Production | 120,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $115,862 | 5,088,218 | kWh | $0.02 |
Electricity Demand | $118,119 | 11,798 | kW-months/year | $10.01 |
Natural Gas | $44,147 | 9,178 | MMBtu | $4.81 |
TOTAL ENERGY COSTS | $302,776 | |||
RECOMMENDED SAVINGS* | $61,479 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,337 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,549 Cost: $2,756 |
$1,176 | 43,376 | $1,373 | 156 | - | - | - | - |
$1,176 43,376 kWh |
$1,373 156 kW-months/year |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $99 Cost: - |
$67 | 2,345 | $32 | 4 | - | - | - | - |
$67 2,345 kWh |
$32 4 kW-months/year |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,378 Cost: $80 |
$2,709 | 99,648 | $1,669 | 190 | - | - | - | - |
$2,709 99,648 kWh |
$1,669 190 kW-months/year |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,212 Cost: $205 |
$2,008 | 73,857 | $1,204 | 137 | - | - | - | - |
$2,008 73,857 kWh |
$1,204 137 kW-months/year |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $166 Cost: - |
$50 | 1,758 | $116 | 13 | - | - | - | - |
$50 1,758 kWh |
$116 13 kW-months/year |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $973 Cost: $4,100 |
$308 | 11,430 | $665 | 76 | - | - | - | - |
$308 11,430 kWh |
$665 76 kW-months/year |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $156 Cost: $75 |
$61 | 2,345 | $95 | 11 | - | - | - | - |
$61 2,345 kWh |
$95 11 kW-months/year |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $26,338 Cost: $3,000 |
- | - | - | - | - | - | $26,338 | - |
- - kWh |
- - kW-months/year |
- - lb |
$26,338 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $23,608 Cost: $11,520 |
- | - | - | - | $23,608 | 1,560 | - | - |
- - kWh |
- - kW-months/year |
$23,608 1,560 lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,479 Cost: $21,736 |
$6,379 | 234,759 | $5,154 | 587 | $23,608 | 1,560 | $26,338 | - | $6,379 234,759 kWh |
$5,154 587 kW-months/year |
$23,608 1,560 lb |
$26,338 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,337 Cost: $10,061 |
$3,609 | 132,766 | $3,390 | 386 | - | - | $26,338 | - | $3,609 132,766 kWh |
$3,390 386 kW-months/year |
- - lb |
$26,338 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Water Consumption |