IAC Assessment: MO0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Aluminum Extrusions
NAICS n/a
SIC 3334 - Primary Aluminum
Sales $10,000,000-$50,000,000
# of Employees 169
Plant Area (Sq.Ft.) 200,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $383,443 7,648,593 kWh $0.05
Electricity Demand $43,923 20,333 kW-months/year $2.16
Natural Gas $591,304 162,342 MMBtu $3.64
TOTAL ENERGY COSTS $1,028,401
RECOMMENDED SAVINGS* $17,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,410
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)
$ kWh $ kW-months/year $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$981
Cost:
$1,097
$886 15,826 $95 48 - - $886
15,826
kWh
$95
48
kW-months/year
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,872
Cost:
$3,120
$1,691 30,481 $181 91 - - $1,691
30,481
kWh
$181
91
kW-months/year
-
-
gal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,350
Cost:
-
$1,257 22,567 $93 47 - - $1,257
22,567
kWh
$93
47
kW-months/year
-
-
gal
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,105
Cost:
$19,207
$9,425 169,402 $680 343 - - $9,425
169,402
kWh
$680
343
kW-months/year
-
-
gal
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,102
Cost:
$460
$996 17,878 $106 54 - - $996
17,878
kWh
$106
54
kW-months/year
-
-
gal
06: 3.1242 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT Savings:
$1,946
Cost:
-
- - - - $1,946 936 -
-
kWh
-
-
kW-months/year
$1,946
936
gal
TOTAL RECOMMENDED Savings:
$17,356
Cost:
$23,884
$14,255 256,154 $1,155 583 $1,946 936 $14,255
256,154
kWh
$1,155
583
kW-months/year
$1,946
936
gal
TOTAL IMPLEMENTED Savings:
$15,410
Cost:
$23,884
$14,255 256,154 $1,155 583 - - $14,255
256,154
kWh
$1,155
583
kW-months/year
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (haz) Electricity Usage Electricity Demand Other Liquid (haz)