Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Packaged Aerosols and Fluids
NAICS n/a
SIC 2842 - Polishes And Sanitation Goods
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 130,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 2,496
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,613 1,740,621 kWh $0.06
Electricity Demand $9,795 5,330 kW-months/year $1.84
Natural Gas $35,156 8,191 MMBtu $4.29
TOTAL ENERGY COSTS $146,614
RECOMMENDED SAVINGS* $33,033 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,174
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,065
Cost:
$1,949
$953 16,706 $112 64 - - - - $953
16,706
kWh
$112
64
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,658
Cost:
$6,064
$2,378 41,618 $280 160 - - - - $2,378
41,618
kWh
$280
160
kW-months/year
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$320
Cost:
-
$307 5,275 $13 7 - - - - $307
5,275
kWh
$13
7
kW-months/year
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,780
Cost:
$160
$3,530 61,841 $250 143 - - - - $3,530
61,841
kWh
$250
143
kW-months/year
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,871
Cost:
$65
$2,682 46,893 $189 108 - - - - $2,682
46,893
kWh
$189
108
kW-months/year
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,579
Cost:
$100
$1,474 25,791 $105 60 - - - - $1,474
25,791
kWh
$105
60
kW-months/year
-
-
lb
-
-
$
07: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$325
Cost:
$60
$190 3,224 $135 77 - - - - $190
3,224
kWh
$135
77
kW-months/year
-
-
lb
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,309
Cost:
$3,205
$1,214 21,102 $95 54 - - - - $1,214
21,102
kWh
$95
54
kW-months/year
-
-
lb
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$76
Cost:
-
$44 879 $32 18 - - - - $44
879
kWh
$32
18
kW-months/year
-
-
lb
-
-
$
10: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$19,050
Cost:
$180
- - - - $2,050 150,000 $17,000 - -
-
kWh
-
-
kW-months/year
$2,050
150,000
lb
$17,000
-
$
TOTAL RECOMMENDED Savings:
$33,033
Cost:
$11,783
$12,772 223,329 $1,211 691 $2,050 150,000 $17,000 - $12,772
223,329
kWh
$1,211
691
kW-months/year
$2,050
150,000
lb
$17,000
-
$
TOTAL IMPLEMENTED Savings:
$23,174
Cost:
$8,253
$3,565 62,427 $559 319 $2,050 150,000 $17,000 - $3,565
62,427
kWh
$559
319
kW-months/year
$2,050
150,000
lb
$17,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material