IAC logo
IAC Assessment: MO0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Suspension Systems and Controls for Truck, Trailer, and Bus
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 90,000
Annual Production 6,500 Pieces
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,142 1,044,256 kWh $0.06
Electricity Demand $17,235 4,596 kW-months/year $3.75
LPG $21,014 4,206 MMBtu $5.00
TOTAL ENERGY COSTS $98,018
RECOMMENDED SAVINGS* $8,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,999
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,231
Cost:
$1,692
$1,000 17,878 $231 70 - - $1,000
17,878
kWh
$231
70
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,387
Cost:
$4,944
$1,916 34,291 $471 142 - - $1,916
34,291
kWh
$471
142
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$303
Cost:
-
$279 4,982 $24 7 - - $279
4,982
kWh
$24
7
kW-months/year
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,024
Cost:
$40
$948 16,999 $76 23 - - $948
16,999
kWh
$76
23
kW-months/year
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$745
Cost:
$180
$689 12,309 $56 17 - - $689
12,309
kWh
$56
17
kW-months/year
-
-
lb
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$64
Cost:
-
$52 879 $12 4 - - $52
879
kWh
$12
4
kW-months/year
-
-
lb
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,317
Cost:
$3,776
$1,062 19,050 $255 77 - - $1,062
19,050
kWh
$255
77
kW-months/year
-
-
lb
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$825
Cost:
-
- - - - $825 15,000 -
-
kWh
-
-
kW-months/year
$825
15,000
lb
09: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$802
Cost:
-
- - - - $802 1,500 -
-
kWh
-
-
kW-months/year
$802
1,500
lb
TOTAL RECOMMENDED Savings:
$8,698
Cost:
$10,632
$5,946 106,388 $1,125 340 $1,627 16,500 $5,946
106,388
kWh
$1,125
340
kW-months/year
$1,627
16,500
lb
TOTAL IMPLEMENTED Savings:
$4,999
Cost:
$10,412
$4,030 72,098 $969 293 - - $4,030
72,098
kWh
$969
293
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)