IAC logo
IAC Assessment: MO0187
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0187
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Bacon and Ham
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 187,000
Annual Production 68,300,000 Pounds
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $655,632 15,201,348 kWh $0.04
Electricity Demand $48,505 27,090 kW-months/year $1.79
Natural Gas $202,342 78,637 MMBtu $2.57
TOTAL ENERGY COSTS $931,439
RECOMMENDED SAVINGS* $59,361 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,854
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,123
Cost:
$1,737
$1,997 46,307 $126 78 - - $1,997
46,307
kWh
$126
78
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,896
Cost:
$6,584
$3,654 84,701 $242 150 - - $3,654
84,701
kWh
$242
150
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$455
Cost:
-
$434 9,965 $21 13 - - $434
9,965
kWh
$21
13
kW-months/year
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,110
Cost:
-
$4,860 112,837 $250 155 - - $4,860
112,837
kWh
$250
155
kW-months/year
-
-
lb
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$23,302
Cost:
$56,120
$22,158 513,775 $1,144 708 - - $22,158
513,775
kWh
$1,144
708
kW-months/year
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,507
Cost:
$555
$4,224 97,890 $283 175 - - $4,224
97,890
kWh
$283
175
kW-months/year
-
-
lb
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$19,968
Cost:
-
- - - - $19,968 730,000 -
-
kWh
-
-
kW-months/year
$19,968
730,000
lb
TOTAL RECOMMENDED Savings:
$59,361
Cost:
$64,996
$37,327 865,475 $2,066 1,279 $19,968 730,000 $37,327
865,475
kWh
$2,066
1,279
kW-months/year
$19,968
730,000
lb
TOTAL IMPLEMENTED Savings:
$54,854
Cost:
$64,441
$33,103 767,585 $1,783 1,104 $19,968 730,000 $33,103
767,585
kWh
$1,783
1,104
kW-months/year
$19,968
730,000
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)