IAC logo
IAC Assessment: MO0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Automotive Brake Cables
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 407
Plant Area (Sq.Ft.) 100,000
Annual Production 9,500,000 Pieces
Production Hrs. Annual 8,064
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,421 3,434,056 kWh $0.05
Electricity Demand $16,103 7,310 kW-months/year $2.20
Natural Gas $20,451 3,861 MMBtu $5.30
TOTAL ENERGY COSTS $222,511
RECOMMENDED SAVINGS* $54,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,922
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,684
Cost:
$3,720
$3,482 64,185 $202 97 - - $3,482
64,185
kWh
$202
97
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,908
Cost:
$8,928
$6,505 119,871 $403 194 - - $6,505
119,871
kWh
$403
194
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$266
Cost:
-
$254 4,689 $12 6 - - $254
4,689
kWh
$12
6
kW-months/year
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$448
Cost:
-
$421 7,913 $27 13 - - $421
7,913
kWh
$27
13
kW-months/year
-
-
lb
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,984
Cost:
$15,706
$8,459 155,920 $525 253 - - $8,459
155,920
kWh
$525
253
kW-months/year
-
-
lb
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,270
Cost:
$145
$3,093 57,151 $177 85 - - $3,093
57,151
kWh
$177
85
kW-months/year
-
-
lb
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,912
Cost:
$40
$4,648 85,580 $264 127 - - $4,648
85,580
kWh
$264
127
kW-months/year
-
-
lb
08: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$25,536
Cost:
-
- - - - $25,536 192,000 -
-
kWh
-
-
kW-months/year
$25,536
192,000
lb
TOTAL RECOMMENDED Savings:
$54,008
Cost:
$28,539
$26,862 495,309 $1,610 775 $25,536 192,000 $26,862
495,309
kWh
$1,610
775
kW-months/year
$25,536
192,000
lb
TOTAL IMPLEMENTED Savings:
$41,922
Cost:
$19,571
$15,455 285,169 $931 448 $25,536 192,000 $15,455
285,169
kWh
$931
448
kW-months/year
$25,536
192,000
lb
Savings
Cost
$ kWh $ kW-months/year $ lb