IAC logo
IAC Assessment: MO0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Automotive Sealants and Adhesives
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 60,000
Annual Production 180,000,000 Pieces
Production Hrs. Annual 5,750
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $202,598 3,990,035 kWh $0.05
Natural Gas $9,906 2,517 MMBtu $3.94
TOTAL ENERGY COSTS $212,647
RECOMMENDED SAVINGS* $74,206 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,062
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$335
Cost:
$675
$335 6,741 - - - - - - $335
6,741
kWh
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$918
Cost:
$2,088
$918 18,171 - - - - - - $918
18,171
kWh
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$187
Cost:
$270
$187 3,810 - - - - - - $187
3,810
kWh
-
-
lb
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,457
Cost:
-
$1,457 28,722 - - - - - - $1,457
28,722
kWh
-
-
lb
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,432
Cost:
$20,208
$8,432 166,178 - - - - - - $8,432
166,178
kWh
-
-
lb
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,629
Cost:
$125
$1,629 32,239 - - - - - - $1,629
32,239
kWh
-
-
lb
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,515
Cost:
$40
$2,515 49,531 - - - - - - $2,515
49,531
kWh
-
-
lb
-
-
$
-
-
$
08: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$58,733
Cost:
$15,000
- - $143 9,563 $1,200 - $57,390 - -
-
kWh
$143
9,563
lb
$1,200
-
$
$57,390
-
$
TOTAL RECOMMENDED Savings:
$74,206
Cost:
$38,406
$15,473 305,392 $143 9,563 $1,200 - $57,390 - $15,473
305,392
kWh
$143
9,563
lb
$1,200
-
$
$57,390
-
$
TOTAL IMPLEMENTED Savings:
$70,062
Cost:
$38,241
$11,329 223,622 $143 9,563 $1,200 - $57,390 - $11,329
223,622
kWh
$143
9,563
lb
$1,200
-
$
$57,390
-
$
Savings
Cost
$ kWh $ lb $ $ $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Solid Waste (non-haz) Personnel Changes Primary Raw Material