IAC logo
IAC Assessment: MO0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Automatic Pull-Cable Parts
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $1,000,000-$5,000,000
# of Employees 500
Plant Area (Sq.Ft.) 10,500
Annual Production 2,000 Tons
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,699 598,769 kWh $0.06
Electricity Demand $3,178 1,485 kW-months/year $2.14
Natural Gas $5,897 849 MMBtu $6.95
TOTAL ENERGY COSTS $93,774
RECOMMENDED SAVINGS* $54,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,943
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$50,000
Cost:
$94,219
- - - - $50,000 6,480 -
-
kWh
-
-
kW-months/year
$50,000
6,480
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$788
Cost:
$90
$753 12,896 $35 20 - - $753
12,896
kWh
$35
20
kW-months/year
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$476
Cost:
$40
$455 7,913 $21 12 - - $455
7,913
kWh
$21
12
kW-months/year
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$684
Cost:
$840
$644 11,137 $40 23 - - $644
11,137
kWh
$40
23
kW-months/year
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$342
Cost:
$274
$321 5,569 $21 12 - - $321
5,569
kWh
$21
12
kW-months/year
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$142
Cost:
-
$136 2,345 $6 4 - - $136
2,345
kWh
$6
4
kW-months/year
-
-
lb
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,917
Cost:
$3,722
$1,832 31,653 $85 49 - - $1,832
31,653
kWh
$85
49
kW-months/year
-
-
lb
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$149
Cost:
-
$143 2,345 $6 4 - - $143
2,345
kWh
$6
4
kW-months/year
-
-
lb
TOTAL RECOMMENDED Savings:
$54,498
Cost:
$99,185
$4,284 73,858 $214 124 $50,000 6,480 $4,284
73,858
kWh
$214
124
kW-months/year
$50,000
6,480
lb
TOTAL IMPLEMENTED Savings:
$52,943
Cost:
$99,055
$2,797 48,359 $146 84 $50,000 6,480 $2,797
48,359
kWh
$146
84
kW-months/year
$50,000
6,480
lb
Savings
Cost
$ kWh $ kW-months/year $ lb