IAC logo
IAC Assessment: MO0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Automotive Mufflers and Exhaust Pipes
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 495
Plant Area (Sq.Ft.) 120,000
Annual Production 4,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $888,207 18,401,524 kWh $0.05
Electricity Demand $95,517 4,838 kW-months/year $19.74
Natural Gas $43,780 10,064 MMBtu $4.35
TOTAL ENERGY COSTS $1,042,198
RECOMMENDED SAVINGS* $67,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $67,954
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $
01: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$16,060
Cost:
$15,000
- - - - - - $16,060 - -
-
kWh
-
-
kW-months/year
-
-
gal
$16,060
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$9,288
Cost:
$7,500
- - - - - - $9,288 - -
-
kWh
-
-
kW-months/year
-
-
gal
$9,288
-
$
03: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$4,800
Cost:
$10,000
- - - - - - $4,800 - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,800
-
$
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$13,642
Cost:
-
- - - - $13,642 982 - - -
-
kWh
-
-
kW-months/year
$13,642
982
gal
-
-
$
05: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$1,052
Cost:
$3,000
- - - - $1,052 2,338 - - -
-
kWh
-
-
kW-months/year
$1,052
2,338
gal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,247
Cost:
$4,192
$3,000 62,720 $247 13 - - - - $3,000
62,720
kWh
$247
13
kW-months/year
-
-
gal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,358
Cost:
$1,718
$1,255 26,084 $103 5 - - - - $1,255
26,084
kWh
$103
5
kW-months/year
-
-
gal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$303
Cost:
-
$289 6,155 $14 1 - - - - $289
6,155
kWh
$14
1
kW-months/year
-
-
gal
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,128
Cost:
$337
$3,765 78,546 $363 18 - - - - $3,765
78,546
kWh
$363
18
kW-months/year
-
-
gal
-
-
$
10: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$14,076
Cost:
$35,980
$12,763 266,120 $1,313 67 - - - - $12,763
266,120
kWh
$1,313
67
kW-months/year
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$67,954
Cost:
$77,727
$21,072 439,625 $2,040 104 $14,694 3,320 $30,148 - $21,072
439,625
kWh
$2,040
104
kW-months/year
$14,694
3,320
gal
$30,148
-
$
TOTAL IMPLEMENTED Savings:
$67,954
Cost:
$77,727
$21,072 439,625 $2,040 104 $14,694 3,320 $30,148 - $21,072
439,625
kWh
$2,040
104
kW-months/year
$14,694
3,320
gal
$30,148
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost