IAC Assessment: MO0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Components for Axles, Light Trucks and Heavy Pick-UP Trucks
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 370
Plant Area (Sq.Ft.) 140,000
Annual Production 3,400,000 Pieces
Production Hrs. Annual 7,700
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,632 4,890,387 kWh $0.04
Electricity Demand $49,134 989 kW-months/year $49.68
Electricity Fees $15,109 - $ -
Natural Gas $360,229 116,035 MMBtu $3.10
TOTAL ENERGY COSTS $612,648
RECOMMENDED SAVINGS* $80,935 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,341
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$22,150
Cost:
$20,000
- - - - - - $22,150 - -
-
kWh
-
-
kW-months/year
-
-
lb
$22,150
-
$
02: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$17,554
Cost:
$15,000
- - - - - - $17,554 - -
-
kWh
-
-
kW-months/year
-
-
lb
$17,554
-
$
03: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$13,440
Cost:
$5,500
- - - - - - $13,440 - -
-
kWh
-
-
kW-months/year
-
-
lb
$13,440
-
$
04: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$4,050
Cost:
$10,000
- - - - - - $4,050 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,050
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,176
Cost:
$333
$5,924 151,231 $1,252 25 - - - - $5,924
151,231
kWh
$1,252
25
kW-months/year
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,809
Cost:
$4,216
$1,518 38,687 $291 6 - - - - $1,518
38,687
kWh
$291
6
kW-months/year
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$151
Cost:
$345
$131 3,224 $20 1 - - - - $131
3,224
kWh
$20
1
kW-months/year
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$164
Cost:
$179
$139 3,517 $25 1 - - - - $139
3,517
kWh
$25
1
kW-months/year
-
-
lb
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$991
Cost:
-
$817 20,809 $174 4 - - - - $817
20,809
kWh
$174
4
kW-months/year
-
-
lb
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,906
Cost:
$4,214
$1,573 40,152 $333 7 - - - - $1,573
40,152
kWh
$333
7
kW-months/year
-
-
lb
-
-
$
11: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$9,720
Cost:
-
- - - - $9,720 9,720 - - -
-
kWh
-
-
kW-months/year
$9,720
9,720
lb
-
-
$
12: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$1,824
Cost:
$2,200
- - - - $1,824 3,240 - - -
-
kWh
-
-
kW-months/year
$1,824
3,240
lb
-
-
$
TOTAL RECOMMENDED Savings:
$80,935
Cost:
$61,987
$10,102 257,620 $2,095 44 $11,544 12,960 $57,194 - $10,102
257,620
kWh
$2,095
44
kW-months/year
$11,544
12,960
lb
$57,194
-
$
TOTAL IMPLEMENTED Savings:
$65,341
Cost:
$49,787
$10,102 257,620 $2,095 44 - - $53,144 - $10,102
257,620
kWh
$2,095
44
kW-months/year
-
-
lb
$53,144
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost