IAC Assessment: MO0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Components for Axles, Light Trucks and Heavy Pick-UP Trucks
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 370
Plant Area (Sq.Ft.) 140,000
Annual Production 3,400,000 Pieces
Production Hrs. Annual 7,700
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $707,148 17,557,738 kWh $0.04
Electricity Demand $48,960 2,451 kW-months/year $19.98
Electricity Fees $91,568 - $ -
Natural Gas $271,837 60,354 MMBtu $4.50
TOTAL ENERGY COSTS $1,165,770
RECOMMENDED SAVINGS* $140,732 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $138,774
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$21,115
Cost:
$25,000
- - - - - - - - $21,115 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$21,115
-
$
02: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$18,140
Cost:
$20,000
- - - - - - - - $18,140 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$18,140
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$10,274
Cost:
$9,500
- - - - - - - - $10,274 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$10,274
-
$
04: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$6,300
Cost:
$12,500
- - - - - - - - $6,300 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$6,300
-
$
05: 3.5131 RECYCLE WHITE WATER Savings:
$44,299
Cost:
$81,000
- - - - $44,299 250,390 - - - - -
-
kWh
-
-
kW-months/year
$44,299
250,390
gal
-
-
lb
-
-
$
06: 3.7196 USE RE-USABLE FILTERS Savings:
$1,958
Cost:
$5,281
- - - - - - $1,958 1,152 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,958
1,152
lb
-
-
$
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$20,198
Cost:
$28,087
$19,231 422,919 $967 48 - - - - - - $19,231
422,919
kWh
$967
48
kW-months/year
-
-
gal
-
-
lb
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$11,419
Cost:
$334
$10,872 239,156 $547 27 - - - - - - $10,872
239,156
kWh
$547
27
kW-months/year
-
-
gal
-
-
lb
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,891
Cost:
$80
$2,753 60,375 $138 7 - - - - - - $2,753
60,375
kWh
$138
7
kW-months/year
-
-
gal
-
-
lb
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,341
Cost:
$3,144
$2,199 48,359 $142 7 - - - - - - $2,199
48,359
kWh
$142
7
kW-months/year
-
-
gal
-
-
lb
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,174
Cost:
$922
$1,104 24,326 $70 4 - - - - - - $1,104
24,326
kWh
$70
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$623
Cost:
$1,346
$593 13,189 $30 2 - - - - - - $593
13,189
kWh
$30
2
kW-months/year
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$140,732
Cost:
$187,194
$36,752 808,324 $1,894 95 $44,299 250,390 $1,958 1,152 $55,829 - $36,752
808,324
kWh
$1,894
95
kW-months/year
$44,299
250,390
gal
$1,958
1,152
lb
$55,829
-
$
TOTAL IMPLEMENTED Savings:
$138,774
Cost:
$181,913
$36,752 808,324 $1,894 95 $44,299 250,390 - - $55,829 - $36,752
808,324
kWh
$1,894
95
kW-months/year
$44,299
250,390
gal
-
-
lb
$55,829
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost