IAC Assessment: MO0206
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0206
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Custom Vinyl Packaging
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 65,000
Annual Production 26,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,349 3,009,965 kWh $0.05
Electricity Demand $19,738 1,134 kW-months/year $17.41
Electricity Fees $24,159 - $ -
TOTAL ENERGY COSTS $197,345
RECOMMENDED SAVINGS* $57,720 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,240
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$26,790
Cost:
$30,000
- - - - - - - - $26,790 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$26,790
-
$
02: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$5,675
Cost:
$15,000
- - - - - - - - $5,675 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$5,675
-
$
03: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$4,225
Cost:
$10,000
- - - - - - - - $4,225 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$4,225
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,491
Cost:
$14,160
$7,092 124,560 $399 23 - - - - - - $7,092
124,560
kWh
$399
23
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,095
Cost:
$1,346
$1,024 17,878 $71 4 - - - - - - $1,024
17,878
kWh
$71
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$119
Cost:
$207
$115 2,052 $4 - - - - - - - $115
2,052
kWh
$4
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,762
Cost:
$232
$1,605 28,136 $157 9 - - - - - - $1,605
28,136
kWh
$157
9
kW-months/year
-
-
gal
-
-
lb
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,254
Cost:
$160
$2,963 51,876 $291 17 - - - - - - $2,963
51,876
kWh
$291
17
kW-months/year
-
-
gal
-
-
lb
-
-
$
09: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,210
Cost:
$1,974
$1,142 19,930 $68 4 - - - - - - $1,142
19,930
kWh
$68
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
10: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$5,619
Cost:
-
- - - - - - $5,619 163 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$5,619
163
lb
-
-
$
11: 3.8136 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED Savings:
$480
Cost:
-
- - - - $480 192 - - - - -
-
kWh
-
-
kW-months/year
$480
192
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$57,720
Cost:
$73,079
$13,941 244,432 $990 57 $480 192 $5,619 163 $36,690 - $13,941
244,432
kWh
$990
57
kW-months/year
$480
192
gal
$5,619
163
lb
$36,690
-
$
TOTAL IMPLEMENTED Savings:
$57,240
Cost:
$73,079
$13,941 244,432 $990 57 - - $5,619 163 $36,690 - $13,941
244,432
kWh
$990
57
kW-months/year
-
-
gal
$5,619
163
lb
$36,690
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost