IAC logo
IAC Assessment: MO0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Food Service Equipment
NAICS n/a
SIC 3430 -
Sales $10,000,000-$50,000,000
# of Employees 157
Plant Area (Sq.Ft.) 62,500
Annual Production 192,000 Pieces
Production Hrs. Annual 6,292
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,826 1,427,022 kWh $0.04
Electricity Demand $8,994 286 kW-months/year $31.45
Electricity Fees $8,994 - $ -
Natural Gas $17,082 2,981 MMBtu $5.73
TOTAL ENERGY COSTS $169,204
RECOMMENDED SAVINGS* $90,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,066
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$5,391
Cost:
$3,500
- - - - - - - - $5,391 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$5,391
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$5,000
Cost:
$12,500
- - - - - - - - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$5,000
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$780
Cost:
$2,032
$687 13,482 $93 4 - - - - - - $687
13,482
kWh
$93
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,526
Cost:
$1,222
$6,011 117,819 $515 19 - - - - - - $6,011
117,819
kWh
$515
19
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$144
Cost:
$276
$136 2,638 $8 1 - - - - - - $136
2,638
kWh
$8
1
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$541
Cost:
$40
$464 9,086 $77 3 - - - - - - $464
9,086
kWh
$77
3
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$553
Cost:
$50
$473 9,379 $80 3 - - - - - - $473
9,379
kWh
$80
3
kW-months/year
-
-
gal
-
-
lb
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,288
Cost:
$1,976
$1,171 22,860 $117 4 - - - - - - $1,171
22,860
kWh
$117
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
09: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$55,000
Cost:
$85,000
- - - - $55,000 30,000 - - - - -
-
kWh
-
-
kW-months/year
$55,000
30,000
gal
-
-
lb
-
-
$
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$15,308
Cost:
$4,860
- - - - - - $15,308 325,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$15,308
325,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$90,531
Cost:
$111,456
$8,942 175,264 $890 34 $55,000 30,000 $15,308 325,000 $10,391 - $8,942
175,264
kWh
$890
34
kW-months/year
$55,000
30,000
gal
$15,308
325,000
lb
$10,391
-
$
TOTAL IMPLEMENTED Savings:
$34,066
Cost:
$24,108
$7,655 150,058 $712 26 - - $15,308 325,000 $10,391 - $7,655
150,058
kWh
$712
26
kW-months/year
-
-
gal
$15,308
325,000
lb
$10,391
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost