IAC logo
IAC Assessment: MO0208
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0208
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Pillows and Cushions
NAICS n/a
SIC 2392 - Housefurnishings, Nec
Sales $10,000,000-$50,000,000
# of Employees 73
Plant Area (Sq.Ft.) 64,000
Annual Production 3,600,000 Pieces
Production Hrs. Annual 2,340
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,412 916,764 kWh $0.03
Electricity Demand $26,350 540 kW-months/year $48.80
Electricity Fees $3,542 - $ -
Natural Gas $11,410 1,691 MMBtu $6.75
TOTAL ENERGY COSTS $75,160
RECOMMENDED SAVINGS* $44,654 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,921
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$20,957
Cost:
$25,000
- - - - - - $20,957 - -
-
kWh
-
-
kW-months/year
-
-
lb
$20,957
-
$
02: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$9,392
Cost:
$20,000
- - - - - - $9,392 - -
-
kWh
-
-
kW-months/year
-
-
lb
$9,392
-
$
03: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$5,760
Cost:
$12,500
- - - - - - $5,760 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,760
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,185
Cost:
$3,600
$736 21,102 $449 9 - - - - $736
21,102
kWh
$449
9
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$81
Cost:
$207
$71 2,052 $10 1 - - - - $71
2,052
kWh
$10
1
kW-months/year
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,021
Cost:
$222
$611 17,585 $410 8 - - - - $611
17,585
kWh
$410
8
kW-months/year
-
-
lb
-
-
$
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$812
Cost:
$2,221
$509 14,654 $303 6 - - - - $509
14,654
kWh
$303
6
kW-months/year
-
-
lb
-
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$5,328
Cost:
-
- - - - $5,328 4 - - -
-
kWh
-
-
kW-months/year
$5,328
4
lb
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$118
Cost:
$30
- - - - $118 3 - - -
-
kWh
-
-
kW-months/year
$118
3
lb
-
-
$
TOTAL RECOMMENDED Savings:
$44,654
Cost:
$63,780
$1,927 55,393 $1,172 24 $5,446 7 $36,109 - $1,927
55,393
kWh
$1,172
24
kW-months/year
$5,446
7
lb
$36,109
-
$
TOTAL IMPLEMENTED Savings:
$36,921
Cost:
$59,721
$509 14,654 $303 6 - - $36,109 - $509
14,654
kWh
$303
6
kW-months/year
-
-
lb
$36,109
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost