Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1997 |
Principal Product | Drilling Rigs and Tools |
NAICS | n/a |
SIC | 3532 - Mining Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 210,000 |
Annual Production | 300 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $134,936 | 2,579,426 | kWh | $0.05 |
Electricity Demand | $17,656 | 756 | kW-months/year | $23.35 |
Electricity Fees | $18,029 | - | $ | - |
Natural Gas | $38,645 | 8,896 | MMBtu | $4.34 |
TOTAL ENERGY COSTS | $260,971 | |||
RECOMMENDED SAVINGS* | $76,899 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,289 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $7,160 Cost: $20,000 |
- | - | - | - | - | - | $7,160 | - |
- - kWh |
- - kW-months/year |
- - lb |
$7,160 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $10,500 Cost: $12,500 |
- | - | - | - | - | - | $10,500 | - |
- - kWh |
- - kW-months/year |
- - lb |
$10,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,205 Cost: $6,224 |
$2,824 | 47,773 | $381 | 16 | - | - | - | - |
$2,824 47,773 kWh |
$381 16 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,289 Cost: $1,942 |
$1,137 | 19,050 | $152 | 7 | - | - | - | - |
$1,137 19,050 kWh |
$152 7 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $530 Cost: $59 |
$483 | 8,206 | $47 | 2 | - | - | - | - |
$483 8,206 kWh |
$47 2 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $258 Cost: $40 |
$235 | 4,103 | $23 | 1 | - | - | - | - |
$235 4,103 kWh |
$23 1 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,252 Cost: $3,564 |
$2,021 | 33,998 | $231 | 10 | - | - | - | - |
$2,021 33,998 kWh |
$231 10 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $49,474 Cost: $85,000 |
- | - | - | - | $49,474 | 30,000 | - | - |
- - kWh |
- - kW-months/year |
$49,474 30,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.7196 USE RE-USABLE FILTERS |
Savings: $2,231 Cost: $1,817 |
- | - | - | - | $2,231 | 936 | - | - |
- - kWh |
- - kW-months/year |
$2,231 936 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $76,899 Cost: $131,146 |
$6,700 | 113,130 | $834 | 36 | $51,705 | 30,936 | $17,660 | - | $6,700 113,130 kWh |
$834 36 kW-months/year |
$51,705 30,936 lb |
$17,660 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,289 Cost: $1,942 |
$1,137 | 19,050 | $152 | 7 | - | - | - | - | $1,137 19,050 kWh |
$152 7 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost |