IAC logo
IAC Assessment: MO0209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Drilling Rigs and Tools
NAICS n/a
SIC 3532 - Mining Machinery
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 210,000
Annual Production 300 Tons
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,936 2,579,426 kWh $0.05
Electricity Demand $17,656 756 kW-months/year $23.35
Electricity Fees $18,029 - $ -
Natural Gas $38,645 8,896 MMBtu $4.34
TOTAL ENERGY COSTS $260,971
RECOMMENDED SAVINGS* $76,899 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,289
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$7,160
Cost:
$20,000
- - - - - - $7,160 - -
-
kWh
-
-
kW-months/year
-
-
lb
$7,160
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$10,500
Cost:
$12,500
- - - - - - $10,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,500
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,205
Cost:
$6,224
$2,824 47,773 $381 16 - - - - $2,824
47,773
kWh
$381
16
kW-months/year
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,289
Cost:
$1,942
$1,137 19,050 $152 7 - - - - $1,137
19,050
kWh
$152
7
kW-months/year
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$530
Cost:
$59
$483 8,206 $47 2 - - - - $483
8,206
kWh
$47
2
kW-months/year
-
-
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$258
Cost:
$40
$235 4,103 $23 1 - - - - $235
4,103
kWh
$23
1
kW-months/year
-
-
lb
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,252
Cost:
$3,564
$2,021 33,998 $231 10 - - - - $2,021
33,998
kWh
$231
10
kW-months/year
-
-
lb
-
-
$
08: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$49,474
Cost:
$85,000
- - - - $49,474 30,000 - - -
-
kWh
-
-
kW-months/year
$49,474
30,000
lb
-
-
$
09: 3.7196 USE RE-USABLE FILTERS Savings:
$2,231
Cost:
$1,817
- - - - $2,231 936 - - -
-
kWh
-
-
kW-months/year
$2,231
936
lb
-
-
$
TOTAL RECOMMENDED Savings:
$76,899
Cost:
$131,146
$6,700 113,130 $834 36 $51,705 30,936 $17,660 - $6,700
113,130
kWh
$834
36
kW-months/year
$51,705
30,936
lb
$17,660
-
$
TOTAL IMPLEMENTED Savings:
$1,289
Cost:
$1,942
$1,137 19,050 $152 7 - - - - $1,137
19,050
kWh
$152
7
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost