IAC logo
IAC Assessment: MO0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Corrugated Packaging
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 150,000
Annual Production 550,000,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,622 2,363,423 kWh $0.02
Electricity Demand $37,317 550 kW-months/year $67.85
Electricity Fees $7,332 - $ -
Natural Gas $126,664 29,428 MMBtu $4.30
TOTAL ENERGY COSTS $268,225
RECOMMENDED SAVINGS* $65,628 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,101
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$10,045
Cost:
$3,500
- - - - - - $10,045 - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,045
-
$
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$6,750
Cost:
$12,500
- - - - - - $6,750 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,750
-
$
03: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$6,400
Cost:
$15,000
- - - - - - $6,400 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,400
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$670
Cost:
$1,696
$371 13,189 $299 4 - - - - $371
13,189
kWh
$299
4
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$185
Cost:
$115
$97 3,517 $88 1 - - - - $97
3,517
kWh
$88
1
kW-months/year
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$94
Cost:
$276
$74 2,638 $20 1 - - - - $74
2,638
kWh
$20
1
kW-months/year
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,007
Cost:
$40
$634 22,860 $373 6 - - - - $634
22,860
kWh
$373
6
kW-months/year
-
-
lb
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,707
Cost:
$2,024
$1,076 38,687 $631 9 - - - - $1,076
38,687
kWh
$631
9
kW-months/year
-
-
lb
-
-
$
09: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$38,290
Cost:
$50,000
- - - - $38,290 6,720 - - -
-
kWh
-
-
kW-months/year
$38,290
6,720
lb
-
-
$
10: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$480
Cost:
$800
- - - - $480 3,510 - - -
-
kWh
-
-
kW-months/year
$480
3,510
lb
-
-
$
TOTAL RECOMMENDED Savings:
$65,628
Cost:
$85,951
$2,252 80,891 $1,411 21 $38,770 10,230 $23,195 - $2,252
80,891
kWh
$1,411
21
kW-months/year
$38,770
10,230
lb
$23,195
-
$
TOTAL IMPLEMENTED Savings:
$19,101
Cost:
$22,611
$1,618 58,031 $1,038 15 - - $16,445 - $1,618
58,031
kWh
$1,038
15
kW-months/year
-
-
lb
$16,445
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost