IAC logo
IAC Assessment: MO0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Packaged Printing Products
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 160,000
Annual Production 114,000,000 Pieces
Production Hrs. Annual 6,860
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,568 2,371,923 kWh $0.02
Electricity Demand $51,620 540 kW-months/year $95.59
Electricity Fees $13,598 - $ -
Natural Gas $17,522 2,311 MMBtu $7.58
TOTAL ENERGY COSTS $198,926
RECOMMENDED SAVINGS* $112,975 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $102,584
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$16,686
Cost:
$25,000
- - - - - - $16,686 - -
-
kWh
-
-
kW-months/year
-
-
lb
$16,686
-
$
02: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$14,518
Cost:
$25,000
- - - - - - $14,518 - -
-
kWh
-
-
kW-months/year
-
-
lb
$14,518
-
$
03: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$4,800
Cost:
$10,000
- - - - - - $4,800 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,800
-
$
04: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,970
Cost:
$3,500
- - - - - - $2,970 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,970
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,859
Cost:
$8,528
$2,253 79,426 $1,606 17 - - - - $2,253
79,426
kWh
$1,606
17
kW-months/year
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$974
Cost:
$1,566
$515 18,171 $459 5 - - - - $515
18,171
kWh
$459
5
kW-months/year
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,305
Cost:
$40
$2,795 98,769 $1,510 16 - - - - $2,795
98,769
kWh
$1,510
16
kW-months/year
-
-
lb
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,359
Cost:
$53
$881 31,067 $478 5 - - - - $881
31,067
kWh
$478
5
kW-months/year
-
-
lb
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$886
Cost:
$378
$551 19,343 $335 4 - - - - $551
19,343
kWh
$335
4
kW-months/year
-
-
lb
-
-
$
10: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$61,750
Cost:
$84,375
- - - - $61,750 3,000 - - -
-
kWh
-
-
kW-months/year
$61,750
3,000
lb
-
-
$
11: 3.7196 USE RE-USABLE FILTERS Savings:
$868
Cost:
$2,079
- - - - $868 360 - - -
-
kWh
-
-
kW-months/year
$868
360
lb
-
-
$
TOTAL RECOMMENDED Savings:
$112,975
Cost:
$160,519
$6,995 246,776 $4,388 47 $62,618 3,360 $38,974 - $6,995
246,776
kWh
$4,388
47
kW-months/year
$62,618
3,360
lb
$38,974
-
$
TOTAL IMPLEMENTED Savings:
$102,584
Cost:
$149,819
$1,066 37,514 $794 9 $61,750 3,000 $38,974 - $1,066
37,514
kWh
$794
9
kW-months/year
$61,750
3,000
lb
$38,974
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost