IAC logo
IAC Assessment: MO0226
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0226
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Beef Patty Processing and Packets Products
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 90,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $263,656 5,395,076 kWh $0.05
Electricity Demand $29,341 1,273 kW-months/year $23.05
Electricity Fees $33,725 - $ -
Natural Gas $14,663 2,908 MMBtu $5.04
TOTAL ENERGY COSTS $516,385
RECOMMENDED SAVINGS* $1,690,908 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$440,000
Cost:
$950,000
- - - - - - $440,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$440,000
-
$
02: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$22,725
Cost:
$25,000
- - - - - - $22,725 - -
-
kWh
-
-
kW-months/year
-
-
lb
$22,725
-
$
03: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$9,450
Cost:
$15,000
- - - - - - $9,450 - -
-
kWh
-
-
kW-months/year
-
-
lb
$9,450
-
$
04: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$5,155
Cost:
$3,700
- - - - - - $5,155 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,155
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,777
Cost:
$3,872
$1,565 28,429 $212 9 - - - - $1,565
28,429
kWh
$212
9
kW-months/year
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$116
Cost:
$207
$111 2,052 $5 1 - - - - $111
2,052
kWh
$5
1
kW-months/year
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$661
Cost:
$80
$620 11,137 $41 2 - - - - $620
11,137
kWh
$41
2
kW-months/year
-
-
lb
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,841
Cost:
$13,179
$10,189 184,936 $652 28 - - - - $10,189
184,936
kWh
$652
28
kW-months/year
-
-
lb
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$383
Cost:
-
$360 6,448 $23 1 - - - - $360
6,448
kWh
$23
1
kW-months/year
-
-
lb
-
-
$
10: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$1,024,800
Cost:
$2,968,600
- - - - $1,024,800 366 - - -
-
kWh
-
-
kW-months/year
$1,024,800
366
lb
-
-
$
11: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$175,000
Cost:
$56,250
- - - - $175,000 15,000 - - -
-
kWh
-
-
kW-months/year
$175,000
15,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$1,690,908
Cost:
$4,035,888
$12,845 233,002 $933 41 $1,199,800 15,366 $477,330 - $12,845
233,002
kWh
$933
41
kW-months/year
$1,199,800
15,366
lb
$477,330
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost