Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1998 |
Principal Product | Banking Equipment and Drive-up Windows |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 75,600 |
Annual Production | 106,742 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $71,044 | 1,331,770 | kWh | $0.05 |
Electricity Demand | $9,513 | 389 | kW-months/year | $24.46 |
Electricity Fees | $11,668 | - | $ | - |
Natural Gas | $83,982 | 14,988 | MMBtu | $5.60 |
TOTAL ENERGY COSTS | $176,207 | |||
RECOMMENDED SAVINGS* | $59,110 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $53,268 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $1,048 Cost: $2,700 |
- | - | - | - | - | - | - | - | $1,048 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$1,048 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.632 CHANGE OPERATING CONDITIONS |
Savings: $553 Cost: $380 |
- | - | - | - | - | - | - | - | $553 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$553 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,270 Cost: $1,717 |
$1,074 | 17,292 | $196 | 8 | - | - | - | - | - | - |
$1,074 17,292 kWh |
$196 8 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $930 Cost: $232 |
$783 | 12,603 | $147 | 6 | - | - | - | - | - | - |
$783 12,603 kWh |
$147 6 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,639 Cost: $2,805 |
$1,492 | 24,033 | $147 | 6 | - | - | - | - | - | - |
$1,492 24,033 kWh |
$147 6 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $206 Cost: - |
$182 | 2,931 | $24 | 1 | - | - | - | - | - | - |
$182 2,931 kWh |
$24 1 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $49,600 Cost: $15,000 |
- | - | - | - | - | - | $49,600 | 12,400 | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$49,600 12,400 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $3,864 Cost: $10,000 |
- | - | - | - | $3,864 | 1,254,544 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,864 1,254,544 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,110 Cost: $32,834 |
$3,531 | 56,859 | $514 | 21 | $3,864 | 1,254,544 | $49,600 | 12,400 | $1,601 | - | $3,531 56,859 kWh |
$514 21 kW-months/year |
$3,864 1,254,544 gal |
$49,600 12,400 lb |
$1,601 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $53,268 Cost: $19,902 |
$2,748 | 44,256 | $367 | 15 | - | - | $49,600 | 12,400 | $553 | - | $2,748 44,256 kWh |
$367 15 kW-months/year |
- - gal |
$49,600 12,400 lb |
$553 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost |