IAC logo
IAC Assessment: MO0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Banking Equipment and Drive-up Windows
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 75,600
Annual Production 106,742 Pieces
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,044 1,331,770 kWh $0.05
Electricity Demand $9,513 389 kW-months/year $24.46
Electricity Fees $11,668 - $ -
Natural Gas $83,982 14,988 MMBtu $5.60
TOTAL ENERGY COSTS $176,207
RECOMMENDED SAVINGS* $59,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,268
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,048
Cost:
$2,700
- - - - - - - - $1,048 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$1,048
-
$
02: 4.632 CHANGE OPERATING CONDITIONS Savings:
$553
Cost:
$380
- - - - - - - - $553 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$553
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,270
Cost:
$1,717
$1,074 17,292 $196 8 - - - - - - $1,074
17,292
kWh
$196
8
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$930
Cost:
$232
$783 12,603 $147 6 - - - - - - $783
12,603
kWh
$147
6
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,639
Cost:
$2,805
$1,492 24,033 $147 6 - - - - - - $1,492
24,033
kWh
$147
6
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$206
Cost:
-
$182 2,931 $24 1 - - - - - - $182
2,931
kWh
$24
1
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$49,600
Cost:
$15,000
- - - - - - $49,600 12,400 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$49,600
12,400
lb
-
-
$
08: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$3,864
Cost:
$10,000
- - - - $3,864 1,254,544 - - - - -
-
kWh
-
-
kW-months/year
$3,864
1,254,544
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$59,110
Cost:
$32,834
$3,531 56,859 $514 21 $3,864 1,254,544 $49,600 12,400 $1,601 - $3,531
56,859
kWh
$514
21
kW-months/year
$3,864
1,254,544
gal
$49,600
12,400
lb
$1,601
-
$
TOTAL IMPLEMENTED Savings:
$53,268
Cost:
$19,902
$2,748 44,256 $367 15 - - $49,600 12,400 $553 - $2,748
44,256
kWh
$367
15
kW-months/year
-
-
gal
$49,600
12,400
lb
$553
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost