IAC Assessment: MO0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Clay Refreactoris, Plastic Refractories, Concrete Castable R
NAICS n/a
SIC 3255 - Clay Refractories
Sales $50,000,000-$100,000,000
# of Employees 425
Plant Area (Sq.Ft.) 1,003,000
Annual Production 28,364,400 Units
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,134,279 26,232,708 kWh $0.04
Electricity Demand $95,807 4,826 kW-months/year $19.85
Electricity Fees $17,362 - $ -
Natural Gas $3,136,773 1,027,896 MMBtu $3.05
LPG $15,962 2,312 MMBtu $6.90
Fuel Oil #1 $59,142 10,421 MMBtu $5.68
TOTAL ENERGY COSTS $4,459,325
RECOMMENDED SAVINGS* $88,232 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,488
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,858
Cost:
$4,700
- - - - - - $2,858 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,858
-
$
02: 4.6320 CHANGE OPERATING CONDITIONS Savings:
$658
Cost:
$518
- - - - - - $658 - -
-
kWh
-
-
kW-months/year
-
-
lb
$658
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,465
Cost:
$13,573
$6,731 153,283 $734 37 - - - - $6,731
153,283
kWh
$734
37
kW-months/year
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,308
Cost:
$244
$11,712 266,706 $596 30 - - - - $11,712
266,706
kWh
$596
30
kW-months/year
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,619
Cost:
$80
$5,341 121,630 $278 14 - - - - $5,341
121,630
kWh
$278
14
kW-months/year
-
-
lb
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,120
Cost:
$18,405
$8,147 185,522 $973 49 - - - - $8,147
185,522
kWh
$973
49
kW-months/year
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,869
Cost:
-
$6,075 138,335 $794 40 - - - - $6,075
138,335
kWh
$794
40
kW-months/year
-
-
lb
-
-
$
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$36,675
Cost:
-
- - - - $36,675 270 - - -
-
kWh
-
-
kW-months/year
$36,675
270
lb
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$6,660
Cost:
-
- - - - $6,660 1,200,000 - - -
-
kWh
-
-
kW-months/year
$6,660
1,200,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$88,232
Cost:
$37,520
$38,006 865,476 $3,375 170 $43,335 1,200,270 $3,516 - $38,006
865,476
kWh
$3,375
170
kW-months/year
$43,335
1,200,270
lb
$3,516
-
$
TOTAL IMPLEMENTED Savings:
$68,488
Cost:
$23,867
$25,934 590,563 $2,363 119 $36,675 270 $3,516 - $25,934
590,563
kWh
$2,363
119
kW-months/year
$36,675
270
lb
$3,516
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost