IAC logo
IAC Assessment: MO0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Automobile Glove Box Doors and Instrament Panels
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 82,035
Annual Production 554,749 Pieces
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $400,327 13,610,199 kWh $0.03
Electricity Demand $333,096 2,383 kW-months/year $139.78
Electricity Fees $111,119 - $ -
Natural Gas $303,651 68,449 MMBtu $4.44
TOTAL ENERGY COSTS $1,254,761
RECOMMENDED SAVINGS* $1,003,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $86,344
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,054
Cost:
$5,060
- - - - - - $2,054 - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,054
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,725
Cost:
$3,200
- - - - - - $1,725 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,725
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$464
Cost:
$345
- - - - - - $464 - -
-
kWh
-
-
kW-months/year
-
-
lb
$464
-
$
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$195
Cost:
$590
$55 1,465 $140 1 - - - - $55
1,465
kWh
$140
1
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,350
Cost:
$7,203
$2,554 67,995 $2,796 20 - - - - $2,554
67,995
kWh
$2,796
20
kW-months/year
-
-
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,666
Cost:
$120
$2,268 60,375 $1,398 10 - - - - $2,268
60,375
kWh
$1,398
10
kW-months/year
-
-
lb
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,694
Cost:
$183
$2,554 67,995 $140 12 - - - - $2,554
67,995
kWh
$140
12
kW-months/year
-
-
lb
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,880
Cost:
$15,338
$4,988 132,767 $4,892 35 - - - - $4,988
132,767
kWh
$4,892
35
kW-months/year
-
-
lb
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,527
Cost:
-
$1,850 49,238 $1,677 12 - - - - $1,850
49,238
kWh
$1,677
12
kW-months/year
-
-
lb
-
-
$
10: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$898,000
Cost:
-
- - - - $898,000 103,430 - - -
-
kWh
-
-
kW-months/year
$898,000
103,430
lb
-
-
$
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$76,000
Cost:
-
- - - - $76,000 3,138 - - -
-
kWh
-
-
kW-months/year
$76,000
3,138
lb
-
-
$
TOTAL RECOMMENDED Savings:
$1,003,555
Cost:
$32,039
$14,269 379,835 $11,043 90 $974,000 106,568 $4,243 - $14,269
379,835
kWh
$11,043
90
kW-months/year
$974,000
106,568
lb
$4,243
-
$
TOTAL IMPLEMENTED Savings:
$86,344
Cost:
$15,683
$4,988 132,767 $4,892 35 $76,000 3,138 $464 - $4,988
132,767
kWh
$4,892
35
kW-months/year
$76,000
3,138
lb
$464
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost