IAC logo
IAC Assessment: MO0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Aluminum Die Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $1,000,000-$5,000,000
# of Employees 70
Plant Area (Sq.Ft.) 27,500
Annual Production 1,164,537 Pounds
Production Hrs. Annual 6,120
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,307 1,846,424 kWh $0.04
Electricity Demand $10,273 408 kW-months/year $25.18
Electricity Fees $12,137 - $ -
Natural Gas $89,276 27,713 MMBtu $3.22
LPG $3,796 266 MMBtu $14.27
TOTAL ENERGY COSTS $196,872
RECOMMENDED SAVINGS* $8,018 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,501
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$20
Cost:
$4,500
- - - - - - - - $20 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$20
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$129
Cost:
$207
$104 2,052 $25 1 - - - - - - $104
2,052
kWh
$25
1
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,139
Cost:
$1,761
$1,038 20,516 $101 4 - - - - - - $1,038
20,516
kWh
$101
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,639
Cost:
$80
$1,513 29,894 $126 5 - - - - - - $1,513
29,894
kWh
$126
5
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,004
Cost:
$57
$727 14,361 $277 11 - - - - - - $727
14,361
kWh
$277
11
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,209
Cost:
$4,403
$3,159 62,427 $50 2 - - - - - - $3,159
62,427
kWh
$50
2
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$795
Cost:
$370
- - - - $795 50 - - - - -
-
kWh
-
-
kW-months/year
$795
50
gal
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$83
Cost:
-
- - - - - - $83 3,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$83
3,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$8,018
Cost:
$11,378
$6,541 129,250 $579 23 $795 50 $83 3,000 $20 - $6,541
129,250
kWh
$579
23
kW-months/year
$795
50
gal
$83
3,000
lb
$20
-
$
TOTAL IMPLEMENTED Savings:
$5,501
Cost:
$10,928
$5,028 99,356 $453 18 - - - - $20 - $5,028
99,356
kWh
$453
18
kW-months/year
-
-
gal
-
-
lb
$20
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost