Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1998 |
Principal Product | Aluminum Die Castings |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 27,500 |
Annual Production | 1,164,537 Pounds |
Production Hrs. Annual | 6,120 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $81,307 | 1,846,424 | kWh | $0.04 |
Electricity Demand | $10,273 | 408 | kW-months/year | $25.18 |
Electricity Fees | $12,137 | - | $ | - |
Natural Gas | $89,276 | 27,713 | MMBtu | $3.22 |
LPG | $3,796 | 266 | MMBtu | $14.27 |
TOTAL ENERGY COSTS | $196,872 | |||
RECOMMENDED SAVINGS* | $8,018 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,501 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $20 Cost: $4,500 |
- | - | - | - | - | - | - | - | $20 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$20 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $129 Cost: $207 |
$104 | 2,052 | $25 | 1 | - | - | - | - | - | - |
$104 2,052 kWh |
$25 1 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,139 Cost: $1,761 |
$1,038 | 20,516 | $101 | 4 | - | - | - | - | - | - |
$1,038 20,516 kWh |
$101 4 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,639 Cost: $80 |
$1,513 | 29,894 | $126 | 5 | - | - | - | - | - | - |
$1,513 29,894 kWh |
$126 5 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,004 Cost: $57 |
$727 | 14,361 | $277 | 11 | - | - | - | - | - | - |
$727 14,361 kWh |
$277 11 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,209 Cost: $4,403 |
$3,159 | 62,427 | $50 | 2 | - | - | - | - | - | - |
$3,159 62,427 kWh |
$50 2 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $795 Cost: $370 |
- | - | - | - | $795 | 50 | - | - | - | - |
- - kWh |
- - kW-months/year |
$795 50 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $83 Cost: - |
- | - | - | - | - | - | $83 | 3,000 | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$83 3,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $8,018 Cost: $11,378 |
$6,541 | 129,250 | $579 | 23 | $795 | 50 | $83 | 3,000 | $20 | - | $6,541 129,250 kWh |
$579 23 kW-months/year |
$795 50 gal |
$83 3,000 lb |
$20 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,501 Cost: $10,928 |
$5,028 | 99,356 | $453 | 18 | - | - | - | - | $20 | - | $5,028 99,356 kWh |
$453 18 kW-months/year |
- - gal |
- - lb |
$20 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost |