IAC logo
IAC Assessment: MO0242
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0242
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Decorative Foil and Film Packaging Products
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 171,000
Annual Production 250,000,000 Thousand Feet
Production Hrs. Annual 7,200
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,162 1,412,954 kWh $0.05
Electricity Demand $38,419 458 kW-months/year $83.88
Electricity Fees $6,446 - $ -
Natural Gas $35,392 7,712 MMBtu $4.59
TOTAL ENERGY COSTS $147,035
RECOMMENDED SAVINGS* $11,920 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,496
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$489
Cost:
$345
- - - - - - $489 - -
-
kWh
-
-
kW-months/year
-
-
lb
$489
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,386
Cost:
$5,555
$3,961 77,081 $1,425 17 - - - - $3,961
77,081
kWh
$1,425
17
kW-months/year
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,073
Cost:
$120
$738 14,361 $335 4 - - - - $738
14,361
kWh
$335
4
kW-months/year
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$808
Cost:
$175
$557 10,844 $251 3 - - - - $557
10,844
kWh
$251
3
kW-months/year
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,422
Cost:
$4,634
$2,500 48,652 $922 11 - - - - $2,500
48,652
kWh
$922
11
kW-months/year
-
-
lb
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$616
Cost:
-
- - - - $616 14 - - -
-
kWh
-
-
kW-months/year
$616
14
lb
-
-
$
07: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$126
Cost:
-
- - - - $126 2 - - -
-
kWh
-
-
kW-months/year
$126
2
lb
-
-
$
TOTAL RECOMMENDED Savings:
$11,920
Cost:
$10,829
$7,756 150,938 $2,933 35 $742 16 $489 - $7,756
150,938
kWh
$2,933
35
kW-months/year
$742
16
lb
$489
-
$
TOTAL IMPLEMENTED Savings:
$10,496
Cost:
$10,654
$7,199 140,094 $2,682 32 $126 2 $489 - $7,199
140,094
kWh
$2,682
32
kW-months/year
$126
2
lb
$489
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost