IAC logo
IAC Assessment: MO0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Frozen and Non-Frozen Food Products
NAICS n/a
SIC 2038 - Frozen Specialties, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 42,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 5,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,674 4,301,290 kWh $0.05
Electricity Demand $17,181 883 kW-months/year $19.46
Electricity Fees $29,350 - $ -
Natural Gas $88,152 18,400 MMBtu $4.79
TOTAL ENERGY COSTS $334,405
RECOMMENDED SAVINGS* $47,925 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,197
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 3.2176 INCREASE USE OF AUTOMATION Savings:
$31,680
Cost:
$7,000
- - - - - - - - $31,680 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$31,680
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,027
Cost:
$8,072
$2,793 53,634 $234 12 - - - - - - $2,793
53,634
kWh
$234
12
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,419
Cost:
$277
$3,205 61,547 $214 11 - - - - - - $3,205
61,547
kWh
$214
11
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,019
Cost:
$40
$961 18,464 $58 3 - - - - - - $961
18,464
kWh
$58
3
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,732
Cost:
$4,699
$3,479 66,823 $253 13 - - - - - - $3,479
66,823
kWh
$253
13
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$3,728
Cost:
$11,000
- - - - $3,728 2,428,800 - - - - -
-
kWh
-
-
kW-months/year
$3,728
2,428,800
gal
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,320
Cost:
-
- - - - - - $1,320 48,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,320
48,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$47,925
Cost:
$31,088
$10,438 200,468 $759 39 $3,728 2,428,800 $1,320 48,000 $31,680 - $10,438
200,468
kWh
$759
39
kW-months/year
$3,728
2,428,800
gal
$1,320
48,000
lb
$31,680
-
$
TOTAL IMPLEMENTED Savings:
$44,197
Cost:
$20,088
$10,438 200,468 $759 39 - - $1,320 48,000 $31,680 - $10,438
200,468
kWh
$759
39
kW-months/year
-
-
gal
$1,320
48,000
lb
$31,680
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost