IAC logo
IAC Assessment: MO0249
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0249
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Addivites for Poultry feed, food grade additives
NAICS n/a
SIC 2087 - Flavoring Extracts And Syrups, Nec
Sales $50,000,000-$100,000,000
# of Employees 107
Plant Area (Sq.Ft.) 152,870
Annual Production 85,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,792 7,120,164 kWh $0.02
Electricity Demand $69,687 1,056 kW-months/year $65.99
Electricity Fees $20,575 - $ -
Natural Gas $866,734 254,926 MMBtu $3.40
TOTAL ENERGY COSTS $1,132,953
RECOMMENDED SAVINGS* $31,092 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,416
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,197
Cost:
-
- - - - - - $10,197 - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,197
-
$
02: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$3,480
Cost:
$4,750
- - - - - - $3,480 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,480
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,335
Cost:
$3,538
$873 31,653 $462 7 - - - - $873
31,653
kWh
$462
7
kW-months/year
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$649
Cost:
$97
$517 18,757 $132 2 - - - - $517
18,757
kWh
$132
2
kW-months/year
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,112
Cost:
$80
$848 30,774 $264 4 - - - - $848
30,774
kWh
$264
4
kW-months/year
-
-
lb
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,235
Cost:
$13,133
$6,189 224,502 $2,046 31 - - - - $6,189
224,502
kWh
$2,046
31
kW-months/year
-
-
lb
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,319
Cost:
$500
$2,319 84,115 - - - - - - $2,319
84,115
kWh
-
-
kW-months/year
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$165
Cost:
-
- - - - $165 6,000 - - -
-
kWh
-
-
kW-months/year
$165
6,000
lb
-
-
$
09: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$3,600
Cost:
-
- - - - $3,600 1,800 - - -
-
kWh
-
-
kW-months/year
$3,600
1,800
lb
-
-
$
TOTAL RECOMMENDED Savings:
$31,092
Cost:
$22,098
$10,746 389,801 $2,904 44 $3,765 7,800 $13,677 - $10,746
389,801
kWh
$2,904
44
kW-months/year
$3,765
7,800
lb
$13,677
-
$
TOTAL IMPLEMENTED Savings:
$20,416
Cost:
$16,768
$7,579 274,912 $2,640 40 - - $10,197 - $7,579
274,912
kWh
$2,640
40
kW-months/year
-
-
lb
$10,197
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost