IAC logo
IAC Assessment: MO0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Bottling Machinery & Glass Making Equipment
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 300,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,787 11,628,078 kWh $0.02
Electricity Demand $263,868 2,366 kW-months/year $111.52
Electricity Fees $29,253 - $ -
Natural Gas $41,070 10,868 MMBtu $3.78
TOTAL ENERGY COSTS $538,967
RECOMMENDED SAVINGS* $59,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,712
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38,472
Cost:
$54,128
$17,456 995,311 $21,016 188 - - - - $17,456
995,311
kWh
$21,016
188
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,192
Cost:
$9,904
$3,489 199,004 $3,703 33 - - - - $3,489
199,004
kWh
$3,703
33
kW-months/year
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$601
Cost:
-
$289 16,413 $312 3 - - - - $289
16,413
kWh
$312
3
kW-months/year
-
-
lb
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,108
Cost:
$3,834
$219 12,603 $2,889 26 - - - - $219
12,603
kWh
$2,889
26
kW-months/year
-
-
lb
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$726
Cost:
-
- - - - $726 60,500 - - -
-
kWh
-
-
kW-months/year
$726
60,500
lb
-
-
$
06: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$8,520
Cost:
$3,700
- - - - - - $8,520 - -
-
kWh
-
-
kW-months/year
-
-
lb
$8,520
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$468
Cost:
$414
$70 4,103 $56 1 - - $342 - $70
4,103
kWh
$56
1
kW-months/year
-
-
lb
$342
-
$
TOTAL RECOMMENDED Savings:
$59,087
Cost:
$71,980
$21,523 1,227,434 $27,976 251 $726 60,500 $8,862 - $21,523
1,227,434
kWh
$27,976
251
kW-months/year
$726
60,500
lb
$8,862
-
$
TOTAL IMPLEMENTED Savings:
$15,712
Cost:
$13,604
$3,489 199,004 $3,703 33 - - $8,520 - $3,489
199,004
kWh
$3,703
33
kW-months/year
-
-
lb
$8,520
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes