Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1999 |
Principal Product | Jacketed Rifle and Pistol Projectiles |
NAICS | n/a |
SIC | 3482 - Small Arms Ammunition |
Sales | $10,000,000-$50,000,000 |
# of Employees | 84 |
Plant Area (Sq.Ft.) | 43,000 |
Annual Production | 116,200,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $72,287 | 1,648,007 | kWh | $0.04 |
Electricity Demand | $10,354 | 418 | kW-months/year | $24.77 |
Electricity Fees | $11,846 | - | $ | - |
Natural Gas | $29,630 | 5,219 | MMBtu | $5.68 |
TOTAL ENERGY COSTS | $135,770 | |||
RECOMMENDED SAVINGS* | $73,210 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $67,918 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,911 Cost: $4,897 |
$3,584 | 70,340 | $327 | 13 | - | - | - | - |
$3,584 70,340 kWh |
$327 13 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,257 Cost: $3,392 |
$2,009 | 39,273 | $248 | 10 | - | - | - | - |
$2,009 39,273 kWh |
$248 10 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,116 Cost: $49 |
$1,032 | 20,223 | $84 | 3 | - | - | - | - |
$1,032 20,223 kWh |
$84 3 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,256 Cost: $40 |
$1,162 | 22,860 | $94 | 4 | - | - | - | - |
$1,162 22,860 kWh |
$94 4 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $1,750 Cost: $450 |
$1,668 | 19,637 | $82 | 3 | - | - | - | - |
$1,668 19,637 kWh |
$82 3 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $2,460 Cost: - |
- | - | - | - | $2,460 | 12,750 | - | - |
- - kWh |
- - kW-months/year |
$2,460 12,750 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $60,000 Cost: $27,500 |
- | - | - | - | - | - | $60,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
$60,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $460 Cost: $345 |
$165 | 3,224 | $10 | 1 | - | - | $285 | - |
$165 3,224 kWh |
$10 1 kW-months/year |
- - lb |
$285 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $73,210 Cost: $36,673 |
$9,620 | 175,557 | $845 | 34 | $2,460 | 12,750 | $60,285 | - | $9,620 175,557 kWh |
$845 34 kW-months/year |
$2,460 12,750 lb |
$60,285 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $67,918 Cost: $36,239 |
$7,261 | 129,250 | $657 | 26 | - | - | $60,000 | - | $7,261 129,250 kWh |
$657 26 kW-months/year |
- - lb |
$60,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |