IAC logo
IAC Assessment: MO0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Plastic Pipe, Electric Conduit
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 64,000
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $771,922 19,546,601 kWh $0.04
Electricity Demand $232,434 2,904 kW-months/year $80.04
Electricity Fees $62,569 - $ -
Natural Gas $32,010 4,752 MMBtu $6.74
TOTAL ENERGY COSTS $1,123,286
RECOMMENDED SAVINGS* $173,201 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,116
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$316
Cost:
$379
$156 3,810 $160 2 - - - - $156
3,810
kWh
$160
2
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$25,036
Cost:
$24,912
$20,338 513,482 $4,698 59 - - - - $20,338
513,482
kWh
$4,698
59
kW-months/year
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,525
Cost:
$200
$2,053 51,876 $472 6 - - - - $2,053
51,876
kWh
$472
6
kW-months/year
-
-
lb
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,218
Cost:
-
$5,049 127,491 $1,169 14 - - - - $5,049
127,491
kWh
$1,169
14
kW-months/year
-
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$24,000
Cost:
-
- - - - $24,000 24,000 - - -
-
kWh
-
-
kW-months/year
$24,000
24,000
lb
-
-
$
06: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$62,546
Cost:
$14,500
- - - - - - $62,546 - -
-
kWh
-
-
kW-months/year
-
-
lb
$62,546
-
$
07: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$52,560
Cost:
$14,000
- - - - - - $52,560 - -
-
kWh
-
-
kW-months/year
-
-
lb
$52,560
-
$
TOTAL RECOMMENDED Savings:
$173,201
Cost:
$53,991
$27,596 696,659 $6,499 81 $24,000 24,000 $115,106 - $27,596
696,659
kWh
$6,499
81
kW-months/year
$24,000
24,000
lb
$115,106
-
$
TOTAL IMPLEMENTED Savings:
$118,116
Cost:
$39,791
$25,543 644,783 $6,027 75 $24,000 24,000 $62,546 - $25,543
644,783
kWh
$6,027
75
kW-months/year
$24,000
24,000
lb
$62,546
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes