Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1999 |
Principal Product | Plastic Pipe, Electric Conduit |
NAICS | n/a |
SIC | 3084 - Plastics Pipe |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 64,000 |
Annual Production | 100,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $771,922 | 19,546,601 | kWh | $0.04 |
Electricity Demand | $232,434 | 2,904 | kW-months/year | $80.04 |
Electricity Fees | $62,569 | - | $ | - |
Natural Gas | $32,010 | 4,752 | MMBtu | $6.74 |
TOTAL ENERGY COSTS | $1,123,286 | |||
RECOMMENDED SAVINGS* | $173,201 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $118,116 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $316 Cost: $379 |
$156 | 3,810 | $160 | 2 | - | - | - | - |
$156 3,810 kWh |
$160 2 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $25,036 Cost: $24,912 |
$20,338 | 513,482 | $4,698 | 59 | - | - | - | - |
$20,338 513,482 kWh |
$4,698 59 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,525 Cost: $200 |
$2,053 | 51,876 | $472 | 6 | - | - | - | - |
$2,053 51,876 kWh |
$472 6 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $6,218 Cost: - |
$5,049 | 127,491 | $1,169 | 14 | - | - | - | - |
$5,049 127,491 kWh |
$1,169 14 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $24,000 Cost: - |
- | - | - | - | $24,000 | 24,000 | - | - |
- - kWh |
- - kW-months/year |
$24,000 24,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $62,546 Cost: $14,500 |
- | - | - | - | - | - | $62,546 | - |
- - kWh |
- - kW-months/year |
- - lb |
$62,546 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.444 INSTALL SYSTEM TO COLLECT SCRAP |
Savings: $52,560 Cost: $14,000 |
- | - | - | - | - | - | $52,560 | - |
- - kWh |
- - kW-months/year |
- - lb |
$52,560 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $173,201 Cost: $53,991 |
$27,596 | 696,659 | $6,499 | 81 | $24,000 | 24,000 | $115,106 | - | $27,596 696,659 kWh |
$6,499 81 kW-months/year |
$24,000 24,000 lb |
$115,106 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $118,116 Cost: $39,791 |
$25,543 | 644,783 | $6,027 | 75 | $24,000 | 24,000 | $62,546 | - | $25,543 644,783 kWh |
$6,027 75 kW-months/year |
$24,000 24,000 lb |
$62,546 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |