IAC logo
IAC Assessment: MO0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Automotive Engines
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 148
Plant Area (Sq.Ft.) 42,200
Annual Production 13,000 Pieces
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,768 1,204,572 kWh $0.04
Electricity Demand $23,133 402 kW-months/year $57.54
Electricity Fees $3,397 - $ -
Natural Gas $34,496 7,559 MMBtu $4.56
TOTAL ENERGY COSTS $117,327
RECOMMENDED SAVINGS* $29,110 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,582
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,430
Cost:
$3,948
$1,085 25,205 $345 6 - - - - - - $1,085
25,205
kWh
$345
6
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,291
Cost:
$97
$1,733 40,152 $558 10 - - - - - - $1,733
40,152
kWh
$558
10
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,662
Cost:
$80
$1,259 29,015 $403 7 - - - - - - $1,259
29,015
kWh
$403
7
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,816
Cost:
$2,451
$1,373 31,653 $443 8 - - - - - - $1,373
31,653
kWh
$443
8
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,475
Cost:
-
- - - - - - $2,475 825 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$2,475
825
lb
-
-
$
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$4,200
Cost:
$2,000
- - - - $4,200 6,000 - - - - -
-
kWh
-
-
kW-months/year
$4,200
6,000
gal
-
-
lb
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$15,236
Cost:
$2,500
- - - - - - - - $15,236 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$15,236
-
$
TOTAL RECOMMENDED Savings:
$29,110
Cost:
$11,076
$5,450 126,025 $1,749 31 $4,200 6,000 $2,475 825 $15,236 - $5,450
126,025
kWh
$1,749
31
kW-months/year
$4,200
6,000
gal
$2,475
825
lb
$15,236
-
$
TOTAL IMPLEMENTED Savings:
$6,582
Cost:
$2,548
$3,106 71,805 $1,001 18 - - $2,475 825 - - $3,106
71,805
kWh
$1,001
18
kW-months/year
-
-
gal
$2,475
825
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Administrative Changes