IAC logo
IAC Assessment: MO0273
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0273
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Lead Pencils
NAICS n/a
SIC 3952 - Lead Pencils And Art Goods
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 118,000
Annual Production 432,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,361 2,387,749 kWh $0.05
Electricity Demand $16,943 703 kW-months/year $24.10
Electricity Fees $18,093 - $ -
Natural Gas $35,677 10,663 MMBtu $3.35
TOTAL ENERGY COSTS $212,651
RECOMMENDED SAVINGS* $97,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,496
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,255
Cost:
$15,503
$10,212 169,988 $1,043 43 - - - - - - - - $10,212
169,988
kWh
$1,043
43
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.1224 REPLACE BOILER Savings:
$35,241
Cost:
$30,000
- - - - $35,241 5,332 - - - - - - -
-
kWh
-
-
kW-months/year
$35,241
5,332
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,777
Cost:
$6,200
$4,404 87,925 $356 33 $(-1,983) (-300) - - - - - - $4,404
87,925
kWh
$356
33
kW-months/year
$(-1,983)
(-300)
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$435
Cost:
$364
- - - - - - - - - - $435 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$435
-
$
05: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT Savings:
$6,510
Cost:
$2,500
- - - - - - $6,510 1,291 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,510
1,291
lb
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,960
Cost:
-
- - - - - - - - - - $2,960 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,960
-
$
07: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$38,200
Cost:
$3,000
- - - - - - - - $38,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$38,200
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$97,378
Cost:
$57,567
$14,616 257,913 $1,399 76 $33,258 5,032 $6,510 1,291 $38,200 - $3,395 - $14,616
257,913
kWh
$1,399
76
kW-months/year
$33,258
5,032
MMBtu
$6,510
1,291
lb
$38,200
-
$
$3,395
-
$
TOTAL IMPLEMENTED Savings:
$46,496
Cost:
$45,503
$10,212 169,988 $1,043 43 $35,241 5,332 - - - - - - $10,212
169,988
kWh
$1,043
43
kW-months/year
$35,241
5,332
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes