IAC logo
IAC Assessment: MO0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Wooden Products
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 60,000
Annual Production 90,000 Tons
Production Hrs. Annual 8,736
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,341 1,391,559 kWh $0.04
Electricity Demand $49,341 427 kW-months/year $115.55
Electricity Fees $6,446 - $ -
TOTAL ENERGY COSTS $106,095
RECOMMENDED SAVINGS* $27,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$294
Cost:
$553
$259 6,448 $35 3 - - - - $259
6,448
kWh
$35
3
kW-months/year
-
-
gal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$421
Cost:
$439
$247 6,155 $174 4 - - - - $247
6,155
kWh
$174
4
kW-months/year
-
-
gal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,472
Cost:
$200
$905 22,567 $567 13 - - - - $905
22,567
kWh
$567
13
kW-months/year
-
-
gal
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$665
Cost:
-
$447 11,137 $218 5 - - - - $447
11,137
kWh
$218
5
kW-months/year
-
-
gal
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,331
Cost:
$1,954
$1,069 26,671 $262 6 - - - - $1,069
26,671
kWh
$262
6
kW-months/year
-
-
gal
-
-
$
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$967
Cost:
$2,600
- - - - $967 600 - - -
-
kWh
-
-
kW-months/year
$967
600
gal
-
-
$
07: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$15,505
Cost:
$1,300
- - - - - - $15,505 - -
-
kWh
-
-
kW-months/year
-
-
gal
$15,505
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$6,895
Cost:
$9,000
- - - - - - $6,895 - -
-
kWh
-
-
kW-months/year
-
-
gal
$6,895
-
$
TOTAL RECOMMENDED Savings:
$27,550
Cost:
$16,046
$2,927 72,978 $1,256 31 $967 600 $22,400 - $2,927
72,978
kWh
$1,256
31
kW-months/year
$967
600
gal
$22,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes