IAC logo
IAC Assessment: MO0282
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0282
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Uniforms
NAICS n/a
SIC 2389 - Apparel And Accessories, Nec
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 35,000
Annual Production 25,720 Pieces
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,620 639,508 kWh $0.06
Electricity Demand $3,649 146 kW-months/year $24.99
Electricity Fees $6,619 - $ -
Natural Gas $10,498 1,645 MMBtu $6.38
TOTAL ENERGY COSTS $61,560
RECOMMENDED SAVINGS* $18,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,395
Cost:
$15,233
$5,872 81,184 $523 21 - - - - $5,872
81,184
kWh
$523
21
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$987
Cost:
$845
$912 12,603 $75 3 - - - - $912
12,603
kWh
$75
3
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$407
Cost:
$122
$382 5,275 $25 1 - - - - $382
5,275
kWh
$25
1
kW-months/year
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$407
Cost:
$40
$382 5,275 $25 1 - - - - $382
5,275
kWh
$25
1
kW-months/year
-
-
lb
-
-
$
05: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$338
Cost:
$240
- - - - $338 48 - - -
-
kWh
-
-
kW-months/year
$338
48
lb
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$836
Cost:
-
- - - - $836 33,436 - - -
-
kWh
-
-
kW-months/year
$836
33,436
lb
-
-
$
07: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$4,380
Cost:
$338
- - - - - - $4,380 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,380
-
$
08: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$5,111
Cost:
$1,400
- - - - - - $5,111 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,111
-
$
TOTAL RECOMMENDED Savings:
$18,861
Cost:
$18,218
$7,548 104,337 $648 26 $1,174 33,484 $9,491 - $7,548
104,337
kWh
$648
26
kW-months/year
$1,174
33,484
lb
$9,491
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost